Photos and renders of the building and grounds — not of this particular unit.
1 / 4
About the building
12-storey residential building in Dubai Islands. Developer — Imtiaz Developments. Architect — Jouzy Consulting Engineers.
What the building has
Swimming pool
About the project
Sunset Bay 2 is a 12-storey residential building in Dubai Islands, currently under construction.
The developer is Imtiaz Developments. The architecture is by Jouzy Consulting Engineers.
The building holds 66 apartments in total.
The database has nothing for this project at the moment: lots come and go here, and it refreshes nightly.
A twelve-storey Imtiaz beachfront building on the Dubai Islands: jacuzzis on the balconies, furniture, Miele appliances. A Blue Flag beach, yacht club and marina are nearby.
What's on offer
Apartments and townhouses. Every unit comes with furniture, Miele appliances and plumbing fixtures included, plus jacuzzis on the balconies.
A full specification matters for a resort island: the apartment enters the rental market right after handover, with no months-long renovation pause.
The project's second phase
The 2 in the name means the first phase is already under construction or completed. That's useful: you can see what the developer delivered in phase one before buying into phase two.
Practical advice: visit the first-phase site and assess the build quality in person. Renders won't show that, and the developer and contractor are usually the same.
The island
Promenades, parks, 9- and 18-hole golf courses, top-category hotels, shops and restaurants. The rooftop has an infinity pool with lounge areas.
The beach's Blue Flag is an international certification for water cleanliness and safety, reconfirmed every year. It's an independent check, not a phrase from the developer.
Seller's materials at sales launch: storey count, specification and island composition.
What the complex has
Swimming pool
Where it is
Nothing in the stock for this project right now
Lots for this project come and go, and the stock is topped up nightly. Message me — I will look through the closed bases and find the closest alternatives in Dubai Islands.
Imtiaz Developments. The architecture is by Jouzy Consulting Engineers.
How many floors does Sunset Bay 2 have?
12. The building has 66 apartments.
When is Sunset Bay 2 handed over?
The project is under construction. I check the exact date for a particular unit in the contract before the deal.
Where is Sunset Bay 2?
Dubai Islands. The reclaimed islands off Deira, formerly Deira Islands: beaches, hotels and new residential on the northern coast.
How much does an apartment in Sunset Bay 2 cost?
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
A mid-market company that went from a handful of projects to a large pipeline in a few years. What rapid growth does to risk, and the specific evidence that separates a good scaler from a stretched one.
SHIONE is Beyond’s second residential project in the SIORA master plan on Dubai Islands: two towers, 603 residences, AED 3bn in value. One-bedroom units launched from about AED 2.7m on a 50/50 payment plan, with handover expected in 2030.
Eight UAE megaprojects and what each means for property: Al Maktoum airport at 260m passengers, the 900 km Etihad Rail, Palm Jebel Ali with 90 km of coast, the Metro Blue Line, Dubai Islands, the $5.7bn Wynn resort, Saadiyat’s museums and Yas Island.
Nakheel has released Bay Estate, the first community on Island E of Dubai Islands: 357 townhouses and villas plus 60 plots around two swimmable lagoons. A three-bedroom townhouse averages AED 5.9m; handover is estimated for January 2031.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.
A chain of reclaimed islands under a single government master plan. Almost no coastal land with direct beach access is left inside the emirate — and one or two new projects launch here every month. The opportunity and the risk are the same fact.
A developer building on the Dubai Islands. Between handover and the first tenant there is a list of connections and registrations, and every one of them needs someone on the ground.
A developer building on the Dubai Islands. The dirham’s peg to the dollar shapes the currency risk for every foreign buyer — and the transfer mechanics have costs of their own.
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.