15-storey residential building in Dubai Islands. Developer — Imtiaz Developments. Architect — Eskan Engineering Consultancy.
What the building has
Swimming pool
Park and landscaping
About the project
Beach Walk 3 is a 15-storey residential building in Dubai Islands, currently under construction.
The developer is Imtiaz Developments. The architecture is by Eskan Engineering Consultancy.
The building holds 82 apartments in total.
There is not a single lot in this project in the database right now — it is refreshed every night, and listings here appear and go.
Fifteen storeys and 82 residences from Imtiaz on Dubai's islands, under construction. A lot in our own stock is priced at AED 1.69 million — the bottom of the district.
What this is
Beach Walk 3 is a 15-storey, 82-residence complex by Imtiaz Developments on Dubai Islands. Status: under construction.
In our own stock, a unit is listed at AED 1.69 million; the size isn't given, so we don't quote a price per square foot.
Eighty-two apartments is an intimate format. This is the third phase in the Beach Walk line.
Price per square foot by Dubai Islands project
Reference points across the islands, worth checking any listing against.
Price per square foot by Dubai Islands project — our own stock
Project
AED / ft²
Lots
Avg. size
Ellington Sands II
2971
3
1466 ft²
Bay Grove Residences
2739
4
1282 ft²
Bay Grove Residences C
2504
6
1814 ft²
Rixos Dubai Islands
2404
5
2604 ft²
Bay Grove Residences B
2384
3
1831 ft²
Bay Villas (standalone)
1863
5
6600 ft²
Bay Villas (townhouses)
1785
4
3728 ft²
Bay Villas
1696
17
4982 ft²
Our own stock as of 28 August 2026: 89 lots across the islands, median AED 5.4 million, average price per square foot AED 2,300. Includes projects with three or more lots and a verified area.
The most affordable way onto the islands
Dubai Islands in our database: 89 lots, median AED 5.4 million, average price per square foot AED 2,300. Our lot is a third of the median.
The district median is driven up by Bay Villas, at five to seven thousand square feet; the apartment segment is noticeably more affordable.
AED 1,690,000 for a seaside apartment is a JVC-level figure — a district with no sea at all. That's the main argument for the islands: waterfront access at half the price of Palm Jumeirah.
The price of that is time. The district's infrastructure is still being built, and for the first few years the owner is living on a construction site.
The propsearch building record: 15 storeys, 82 residences, developer Imtiaz Developments, status "under construction." Our own stock as of 28 August 2026: the project's lot (price), the calculation across island projects, and medians and price per square foot for Dubai Islands, Palm Jumeirah and JVC.
What the complex has
Swimming pool
Park and landscaping
Where it is
Nothing in the stock for this project right now
The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Dubai Islands.
Imtiaz Developments. The architecture is by Eskan Engineering Consultancy.
How many floors does Beach Walk 3 have?
15. The building has 82 apartments.
When is Beach Walk 3 handed over?
The project is under construction. I check the exact date for a particular unit in the contract before the deal.
Where is Beach Walk 3?
Dubai Islands. The reclaimed islands off Deira, formerly Deira Islands: beaches, hotels and new residential on the northern coast.
How much does an apartment in Beach Walk 3 cost?
There are no open listings for this building in the database right now. I will check the price for a particular layout against the closed databases and send it with the deal costs worked out.
A mid-market company that went from a handful of projects to a large pipeline in a few years. What rapid growth does to risk, and the specific evidence that separates a good scaler from a stretched one.
SHIONE is Beyond’s second residential project in the SIORA master plan on Dubai Islands: two towers, 603 residences, AED 3bn in value. One-bedroom units launched from about AED 2.7m on a 50/50 payment plan, with handover expected in 2030.
Eight UAE megaprojects and what each means for property: Al Maktoum airport at 260m passengers, the 900 km Etihad Rail, Palm Jebel Ali with 90 km of coast, the Metro Blue Line, Dubai Islands, the $5.7bn Wynn resort, Saadiyat’s museums and Yas Island.
Nakheel has released Bay Estate, the first community on Island E of Dubai Islands: 357 townhouses and villas plus 60 plots around two swimmable lagoons. A three-bedroom townhouse averages AED 5.9m; handover is estimated for January 2031.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.
A chain of reclaimed islands under a single government master plan. Almost no coastal land with direct beach access is left inside the emirate — and one or two new projects launch here every month. The opportunity and the risk are the same fact.
A developer building on the Dubai Islands. Between handover and the first tenant there is a list of connections and registrations, and every one of them needs someone on the ground.
A developer building on the Dubai Islands. The dirham’s peg to the dollar shapes the currency risk for every foreign buyer — and the transfer mechanics have costs of their own.