Skip to content

Sell your apartment in Dubai

Leave your name and phone number — I will get back to you to discuss price and timing.

How I sell apartments →

KORE by Imtiaz

DubaiLand Residence Complex · Imtiaz Developments

Project factsheet

Developer Imtiaz Developments
Status Under construction
District DubaiLand Residence Complex
Layouts studios, 1 and 2 bedrooms
Handover Q4 2028

Layouts and the handover date come from the sales-launch announcement; the date of that announcement is shown next to the prices. It is what the developer claimed at launch, not a registry record — off-plan, phasing and dates get revised. I will send the current ones over WhatsApp.

Developer prices

These are the starting prices as of the date shown, not today's list: off-plan they are revised several times a year, and more often upwards than down.

Payment plan
50/50 or 60/40 with 40% paid over three years after handover — the second option is priced 10% higher
Handover
Q4 2028
Developer
Imtiaz Developments

Figures come from the developer's own materials sent to brokers, dated 16 November 2026. The commentary behind them is written up in the Russian version of this page.

Floor plans

Floor plans from the developer's own materials. The areas and the unit split on them were correct when the drawing was issued — check them against the plan attached to the contract before the deal.

About the building

A residential building in DubaiLand Residence Complex, currently under construction. Developer — Imtiaz Developments.

About the project

KORE by Imtiaz is a residential building in DubaiLand Residence Complex, handover is due Q4 2028.

The developer is Imtiaz Developments.

Layouts, according to the sales-launch announcement — studios, 1 and 2 bedrooms.

There is not a single lot in this project in the database right now — it is refreshed every night, and listings here appear and go.

How many deals this location is doing

4.7% of the month's registrations in Dubai

That is the share of every off-plan deal in the emirate for the month that went to Dubailand Residence Complex — out of 9 475 registrations. For scale: off-plan accounts for 72.8% of the market as a whole, so the bulk of the city's turnover runs through construction rather than through finished homes.

🔴 This is a figure for the location, not for this building. A cluster holds dozens of towers with different handover dates and prices, and a high share means there is a lot of supply here and a lot of deals — not that this particular tower sells better than its neighbour. On a resale that cuts both ways: liquidity is higher, but so is the number of flats competing with yours.

Monthly ValuStrat market review for July 2026, checked 24 August 2026.

Where it is

The pin is placed by district — I send the exact address on request.

Nothing in the stock for this project right now

Listings for KORE by Imtiaz do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in DubaiLand Residence Complex.

Ask about this project
Handover payment

A mortgage covers the final instalment

The final payment on this building falls in 2028 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.

  • Up to 80% of the appraised value, no extra down payment
  • 3.99% fixed for three years, up to 25 years in term
  • 6–12 months before the keys — the bank wants six months of income history

Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.

Ask on WhatsApp

Frequently asked about KORE by Imtiaz

Who is the developer of KORE by Imtiaz?

Imtiaz Developments.

When is KORE by Imtiaz handed over?

The sales-launch announcement says Q4 2028. The date in the contract for a particular unit can differ — I check it before the deal.

What layouts are there in KORE by Imtiaz?

Studios, 1-bedroom and 2-bedroom, according to the sales-launch announcement. Which sizes are actually free right now depends on what is on the market; I will send the current list.

Where is KORE by Imtiaz?

Dubailand Residence Complex. Dubailand Residence Complex (DLRC) is the affordable apartment and townhouse district on the eastern side of Dubailand, by Emirates Road and the Dubai–Al Ain highway.

How much does an apartment in KORE by Imtiaz cost?

Our database has no open listings for KORE by Imtiaz at the moment. I will check the price of the layout you want against the closed databases and send it together with the deal costs.

In the news

What has been written about the building, its developer and DubaiLand Residence Complex

Where this project stands today

Message me for the free layouts in KORE by Imtiaz, the real entry price and what owners and tenants say — not the brochure copy.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram

Who is this lot for?

One question, and the chat opens with the request ready.