Photos and renders of the building and grounds — not of this particular unit.
1 / 4
Layouts and the handover date come from the sales-launch announcement; the date
of that announcement is shown next to the prices. It is what the developer
claimed at launch, not a registry record — off-plan, phasing and dates get
revised. I will send the current ones over WhatsApp.
Developer prices
These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
2 bedrooms — 9 lots
from AED 1 730 374 1 105–1 175 sqftas of 10 August 2026
Retail unit — 1 lot
from AED 4 669 610 1 237 sqftas of 10 August 2026
Payment plan
60/40 per the availability list; in the August package the developer offered 20/80 with a 5% discount on this building
Handover
Q1 2028
Developer
Imtiaz Developments
Figures come from the developer's own materials sent to brokers, dated 10 August 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
A residential building in Dubai South, currently under construction. Developer — Imtiaz Developments.
Specifications for Enre Residences as published by the developer — the project is under construction, so there is no Land Department record yet.
They describe the whole building, not the individual unit.
About the project
Enre Residences is a residential building in Dubai South, handover is due Q1 2028.
The developer is Imtiaz Developments.
Layouts, according to the sales-launch announcement — 2 bedrooms.
There is not a single lot in this project in the database right now — it is refreshed every night, and listings here appear and go.
An Imtiaz building in Dubai South handing over in Q1 2028 — in August the developer still had nine two-bedrooms from AED 1.73 million.
What it is
Enre Residences is a residential building by Imtiaz Developments in Dubai South, status "under construction", launch handover Q1 2028. Storeys and total unit count aren't in our data.
The unit-by-unit availability list of 10 August 2026 had ten units left: nine two-bedrooms of 1,105–1,175 ft² from AED 1,730,374, all facing the boulevard, and one 1,237 ft² retail unit from AED 4,669,610.
The directory lists Inara Residence by the same developer nearby.
Terms that keep moving
The availability list shows a 60/40 payment plan. The August terms package of 28 August carried no prices at all: the developer offered 20/80 with a time-limited 5% discount.
20/80 means most of the money is due at handover: by 2028 you'll need either a large sum in hand or an approved mortgage.
The discount is checked on the date of the deal and should appear in the contract as the final price, not as a promise.
Dubai South
The area around Al Maktoum airport and Expo City is a bet on infrastructure that doesn't exist yet. Our database has 99 lots — 75 under construction, 20 ready — median AED 4,199,800, AED 1,510/ft², entry from AED 580,000.
The Marina is about forty minutes away on a clear road. The investment case works on a long horizon, and only if the airport actually reaches its planned capacity.
Sales launch: developer Imtiaz Developments, status "under construction", handover Q1 2028, two-bedroom layouts. Imtiaz availability list of 10.08.2026 (9 two-bedrooms from AED 1,730,374, 1,105–1,175 ft²; retail unit from AED 4,669,610, 1,237 ft²; 60/40 plan) and terms package of 28.08.2026 (20/80, 5% discount). Our stock as of 21 September 2026: no units in the building; Dubai South — 99 lots, median AED 4,199,800, AED 1,510/ft².
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Dubai South.
The final payment on this building falls in 2028 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The sales-launch announcement says Q1 2028. The date in the contract for a particular unit can differ — I check it before the deal.
What layouts are there in Enre Residences?
2-bedroom, according to the sales-launch announcement. Which sizes are actually free right now depends on what is on the market; I will send the current list.
Where is Enre Residences?
Dubai South. The airport city: Al Maktoum International, Expo City and a vast planned district on the Abu Dhabi side of the emirate.
How much does an apartment in Enre Residences cost?
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
Dubai South’s free zone issues a same-day e-licence for qualifying digital activities, from AED 12 500, entirely online. At the national level the goal is bigger: from 1.2 million companies today to more than 2 million by 2031, plus at least ten new unicorns.
August 2026 in numbers: about 10 900 homes sold for AED 23.4bn, average prices 1.7% below a year earlier, three quarters of sales off-plan, and Dubai South leading on volume. What changed over the season and what to expect this autumn.
fDi Markets data shows Dubai attracted 754 new greenfield creative-industry projects in 2025, worth $3.76bn and creating 19 304 jobs, the top city out of 233 for the fourth year running. Separately, Al Maktoum airport is getting a 50km underground people mover. What both mean for rental demand.
The RTA is planning a 55 km, five-station Airport Express Line from DXB via Al Jaddaf and Al Khail Road to JVC and Al Maktoum, with flight check-in at the stations. Etihad Rail is separately building a 350 km/h Abu Dhabi–Dubai line with a 30-minute journey. What it means for JVC and Al Jaddaf.
July 2026: 13 930 sales worth AED 34.9bn, down about 31% in number on a record July 2025. August: around 11 600 sales worth AED 27.9bn, down 37% in number and 44% in value. Where the slowdown is real, and where it is a base effect.
It is easy to fall into two extremes about a cultural landmark next door — that it automatically lifts prices, or that it means nothing. Neither is right.
A developer building in Dubai South. Ownership and residency are separate things here, and the practical consequences of leaving are smaller than most owners fear — with exceptions.
The developer of the residential districts around Al Maktoum International. What an infrastructure-led location offers, and how to think about a thesis that depends on someone else’s timetable.
A mid-market company that went from a handful of projects to a large pipeline in a few years. What rapid growth does to risk, and the specific evidence that separates a good scaler from a stretched one.
Where this project stands today
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.