Photos and renders of the building and grounds — not of this particular unit.
1 / 11
About the building
Located in Yas Island, currently under construction. Developer — Aldar Properties.
Specifications for Yas Golf Collection as published by the developer — the project is under construction, so there is no Land Department record yet.
They describe the whole building, not the individual unit.
About the project
Yas Golf Collection is a residential complex of several buildings in Yas Island.
The developer is Aldar Properties.
The database currently holds 5 lots in this project, from 2 599 990 AED; 5 of them priced below the market, the deepest discount 8%.
An Aldar quarter overlooking the golf course on Yas Island: studios and one-bedrooms are handed over furnished, and every unit has a view of the course, the sea, Ferrari World, or the internal souk.
What was on offer at launch
Figures from the developer's factsheet dated 12 July 2022: studios of 452–674 sq ft from AED 749,000, one-bedrooms of 883–1,237 sq ft from AED 1,240,000. The whole project was valued at AED 1.7 billion.
Furnishing is split by building: studios and one-bedrooms in Souq Furnished Apartments and in Residences C are handed over fully furnished, while two- and three-bedrooms in Residences C are unfurnished. Buyers in Souq Furnished Apartments were offered a choice of three colour schemes.
The stated sustainability rating: 2 Pearl for the residential buildings under the local rating system, 1 Pearl for the common areas. The quarter is marked pet-friendly.
What's around it
Per the same factsheet: a supermarket 250 metres away, the Al Maha St / Ferrari World West bus stop 600 metres away, Burjeel Medical Centre 2 km away, West Yas Academy school 2.3 km away, Blossom Waters Edge nursery 3.9 km away, a petrol station 5.2 km away, downtown Abu Dhabi 35 km away.
Nearby on the island: Yas Mall, Yas Beach, Yas Bay Waterfront, Etihad Arena, Yas Marina Circuit, Ferrari World and Yas Waterworld.
Completion
In January 2024 the project was at an advanced stage of construction, with completion expected in 2025.
A developer promotion at the time waived the 2% registration fee for buyers.
Sizes, launch prices, furnishing composition, Pearl ratings and distances to infrastructure — developer project factsheet, data as of 12 July 2022. Construction stage, completion date and promotion — apartment round-up, January 2024.
How much does an apartment in Yas Golf Collection cost?
The database currently holds 5 lots in this project, from 2 599 990 AED; 5 of them priced below the market, the deepest discount 8%. Prices in the base are live and update every day; ask for the current list for the building before deciding.
Terminal A at Abu Dhabi’s airport opened in November 2023 after years on hold: 742 000 sq m, capacity for 45m passengers a year. Renamed Zayed International in February 2024, it handled a record 32.5m passengers in 2025 (+12.8%). What that means for housing on Yas Island and in Al Raha.
Miral will invest over AED 12bn (about $3.3bn) on Yas Island over five years in park expansions, new rides and hotels — separate from the Disney resort, whose opening date and site are still not officially disclosed. What it means for rentals on the island.
Hilton enters Abu Dhabi housing with two flags: Aldar’s Waldorf Astoria Residences Yas sold all 133 homes on launch day for AED 850m, and Emirates Developments’ Hilton Residences Al Raha offers 176 sea-view homes from AED 2.5m. Both complete in Q4 2028.
In February 2026 Aldar added more than 2.3m sqm on Saadiyat, Yas and next to Yas for about 3 000 homes with a GDV near AED 23bn ($6.26bn). That averages AED 7.7m per home — what it says about the launches to come.
Since December 2024 Abu Dhabi has offered a 10-year Golden Visa to owners of yachts of 40 metres or more and to senior yachting executives under Golden Quay: Yas Marina nominates, ADIO processes. No berthing contract is needed and family can be included. What it signals for Yas Island.
The roughly $1.7 billion project is going up on Yas Island between Yas Mall and SeaWorld. Capacity of up to 20 000 and a 16K Exosphere screen wrapping the whole building. What it changes for property on the island.
The final waterfront plot on an island that already has a Formula 1 circuit, theme parks and a mall. What it means to buy into the closing phase of a fully formed destination.
The largest listed developer in Abu Dhabi, now building in Dubai too. Where the two emirates diverge on ownership zones, registration and rent regulation — and what that means for a foreign buyer.
Ohana Development is building the UAE's first waterfront community branded by Manchester City football club on Yas Island: around 2 000 units led by villas, a football pitch, an academy and 500 000+ sqm of green space.
Where this project stands today
Message me for the free layouts in Yas Golf Collection, the real entry price and what owners and tenants say — not the brochure copy.