Skip to content

VERDAN1A 5

DubaiLand Residence Complex · Object 1

Project factsheet

Developer Object 1
Status Under construction
District DubaiLand Residence Complex
Handover Q4 2027

Layouts and the handover date come from the developer's brochure in our archive. Prices and payment plans from the same source are deliberately not published: they are dated to when the brochure was issued and do not match today's prices. I will send the current ones over WhatsApp.

About the building

A residential building in DubaiLand Residence Complex, currently under construction. Developer — Object 1.

Specifications for VERDAN1A 5 per Propsearch and the Dubai Land Department. They describe the whole building, not the individual unit.

About the project

VERDAN1A 5 is a residential building in DubaiLand Residence Complex, handover is due Q4 2027.

The developer is Object 1.

No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.

An Object 1 complex in Dubailand Residence Complex: studios from 35 m² are priced from $173,000, with payments running at one percent a month. Pools and sports areas are moved up to the roof.

Prices and floor areas

Studios from 35 m² start at $173,000, one-bedrooms from 68 m² at $302,000, two-bedrooms from 115 m² at $467,000.

That works out to around $4,900/m² for a studio and around $4,100/m² for a two-bedroom. Larger units offer better value per square metre, even though the studio's ticket price remains one of the lowest in the district.

Roof instead of podium

The pools, loungers, sports and play areas here are moved up to the roof rather than laid out on a podium as at most neighbouring projects. The difference is practical: the roof is quieter and isn't next to the parking, but that kind of area is usually smaller.

Inside the building: a residents' club, a gym, a sauna and steam room, barbecue spots, and a children's play area.

The district

The Al Habtoor Polo Club is stated at ten minutes away, and Global Village, GEMS schools, and a shopping mall at around fifteen. The district has parks, shops, cafes, and clinics, plus a planned station on the metro's blue line.

DLRC is being built out fast and densely: several similar-format projects are going up nearby at the same time. That's a restraining factor on rents, but for a buyer choosing between projects it's the opposite — there's plenty to compare.

Sales-launch materials from the selling side: floor areas, prices, payment schedule, and amenities. Price per square metre is our own calculation.

How many deals this location is doing

4.7% of the month's registrations in Dubai

That is the share of every off-plan deal in the emirate for the month that went to Dubailand Residence Complex — out of 9 475 registrations. For scale: off-plan accounts for 72.8% of the market as a whole, so the bulk of the city's turnover runs through construction rather than through finished homes.

🔴 This is a figure for the location, not for this building. A cluster holds dozens of towers with different handover dates and prices, and a high share means there is a lot of supply here and a lot of deals — not that this particular tower sells better than its neighbour. On a resale that cuts both ways: liquidity is higher, but so is the number of flats competing with yours.

Monthly ValuStrat market review for July 2026, checked 24 August 2026.

Where it is

The pin is placed by district — I send the exact address on request.

Nothing in the stock for this project right now

Listings for VERDAN1A 5 do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in DubaiLand Residence Complex.

Ask about this project
Handover payment

A mortgage covers the final instalment

The final payment on this building falls in 2027 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.

  • Up to 80% of the appraised value, no extra down payment
  • 3.99% fixed for three years, up to 25 years in term
  • 6–12 months before the keys — the bank wants six months of income history

Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.

Ask on WhatsApp

Frequently asked about VERDAN1A 5

Who is the developer of VERDAN1A 5?

Object 1.

When is VERDAN1A 5 handed over?

The developer's brochure says Q4 2027. The date in the contract for a particular unit can differ — I check it before the deal.

Where is VERDAN1A 5?

Dubailand. Not one district but a vast planned region covering much of inland Dubai — a name that means very little without a sub-community attached.

How much does an apartment in VERDAN1A 5 cost?

No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.

Where this project stands today

I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram