Photos and renders of the building and grounds — not of this particular unit.
1 / 6
Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
About the building
A residential building in Dubailand, currently under construction. Developer — Aldar.
Specifications for The Wilds per Propsearch and the Dubai Land Department.
They describe the whole building, not the individual unit.
About the project
The Wilds is a residential building in Dubailand, handover is due Q2 2029.
The developer is Aldar.
There is not a single lot in this project in the database right now — it is refreshed every night, and listings here appear and go.
Two collections of two-storey villas — Cassia and Ravenna — in an Aldar eco-community opposite Global Village. A bird-nesting pavilion, a beehive, a school with a forest campus, and a community garden.
Two collections, one community
Cassia and Ravenna differ in layout and facade. When choosing between them, compare not the renderings but the house's placement on the plot and the orientation of its windows: in Dubai's climate, the compass direction affects the air-conditioning bill more than the finish does.
Ecology as a measurable quantity
The community is built to environmental standards, and the houses are described as energy-efficient. In Dubai, that has a direct monetary value: air conditioning makes up the bulk of the electricity bill.
That's why it's worth asking the developer for specifics — glazing rating, insulation thickness, whether solar panels are fitted. The beehive and bird nests shape the atmosphere but not the bill; maintaining them, though, goes into the community charge.
The developer
Aldar is Abu Dhabi's largest developer, also active in Dubai. For off-plan housing, a developer's scale reduces the main risk: large companies are less likely to miss their deadlines.
Launch
Aldar launched The Wilds in February 2025, among its first Dubai projects after entering the market a year earlier. It offers villas with three to six bedrooms.
The concept is built around biodiversity — nature parks, bird habitats and beehives — with homes set into the landscape.
The selling side's launch materials: the collections' composition, the community description, and the developer. Launch date and villa sizes — launch announcement, February 2025.
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
Listings for The Wilds do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Dubailand.
The final payment on this building falls in 2029 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The developer's brochure says Q2 2029. The date in the contract for a particular unit can differ — I check it before the deal.
Where is The Wilds?
Dubailand. Not one district but a vast planned region covering much of inland Dubai — a name that means very little without a sub-community attached.
How much does an apartment in The Wilds cost?
There are no open listings for this building in the database right now. I will check the price for a particular layout against the closed databases and send it with the deal costs worked out.
Construction Week ranks the 100 largest developers in the Gulf by the value of completed and under-construction projects. UAE developers hold more than half the spots — from Emaar and Aldar to DAMAC and Danube. How to read the ranking, and what it tells a buyer.
In October 2024 UK-founded LEOS moved its global headquarters to Dubai and announced a $7bn fund for 10+ UAE projects. A year later it launched LEOS Royal with Dubai Holding: about 800 villas and townhouses in Wadi Al Safa 5, valued at AED 5bn+. How to read a developer like this.
Hilton enters Abu Dhabi housing with two flags: Aldar’s Waldorf Astoria Residences Yas sold all 133 homes on launch day for AED 850m, and Emirates Developments’ Hilton Residences Al Raha offers 176 sea-view homes from AED 2.5m. Both complete in Q4 2028.
Three major office schemes are rising around DIFC and Business Bay: Immersive Tower ($300m, 58 573 sq m, 2027), Aldar's 88 000 sq m tower by Emirates Towers metro (Q4 2027), and an office park with a theatre on Business Bay's largest plot. Vacancy in central clusters sits at 2–5%.
In February 2026 Aldar added more than 2.3m sqm on Saadiyat, Yas and next to Yas for about 3 000 homes with a GDV near AED 23bn ($6.26bn). That averages AED 7.7m per home — what it says about the launches to come.
Aldar entered Ras Al Khaimah with two Al Marjan Island schemes: Nikki Beach Residences (November 2023, 1–4 bed apartments plus villas) and Rosso Bay Residences (July 2024, from about AED 1.5m). Both are sold out by the developer; portals show handover in Q4 2028.
Two branded launches on Saadiyat six months apart: Aldar’s Mandarin Oriental Residences (about 228 homes, designed by BIG, from AED 6.2m, Q3 2028) and Nord’s Henge Residences (166 homes, from AED 1.1m, 2028). Guggenheim Abu Dhabi opens on 11 December 2026.
In May 2026 Dubai Holding took ICD's 22.27% of Emaar for AED 23.9bn, lifting its stake to 29.73%. Mubadala raised its Aldar holding from 26.26% to 28.03% between March and August. What the reshuffle means for buyers of the UAE's two flagship developers.
In January 2024 Aldar opened two mid-market schemes: Manarat Living 2 on Saadiyat (232 homes, from about AED 730k) and Reeman Living 2 in Al Shamkha (from about AED 420k). Reeman Living 2 was scheduled for Q1 2026 and Manarat Living 2 for 2027.
Where this project stands today
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.