Skip to content

Manarat Living III

Saadiyat Island · Aldar

Project factsheet

Developer Aldar
Status Under construction
District Saadiyat Island
Handover Q3 2028

Layouts and the handover date come from the developer's brochure in our archive. Prices and payment plans from the same source are deliberately not published: they are dated to when the brochure was issued and do not match today's prices. I will send the current ones over WhatsApp.

About the building

A residential building in Saadiyat Island, currently under construction. Developer — Aldar.

Specifications for Manarat Living III per Propsearch and the Dubai Land Department. They describe the whole building, not the individual unit.

About the project

Manarat Living III is a residential building in Saadiyat Island, handover is due Q3 2028.

The developer is Aldar.

The database currently holds 2 lots in this project, from 1 800 000 AED; 2 of them priced below the market, the deepest discount 5%.

A mid-rise Aldar building in the Grove community on Saadiyat — within walking distance of the Louvre, the Zayed National Museum and the Guggenheim. Five minutes from Saadiyat Beach, with a three-year payment plan.

A museum district on your doorstep

Saadiyat's cultural district comprises the Louvre Abu Dhabi, the Zayed National Museum and Guggenheim under construction, and the Manarat Al Saadiyat gallery. No other concentration of museums like it exists anywhere else in the region.

For letting, that creates a specific but stable pool of demand: employees of cultural institutions, academics, visiting researchers. Leases are long, turnover is low.

This being the third phase of the project means the first two have already shown how it works in practice — there's something to look at before committing.

Abu Dhabi, not Dubai

A separate market with its own rules for foreign buyers, its own price dynamics and its own liquidity. Comparing yield directly against Dubai isn't a fair comparison.

Aldar is the emirate's largest developer, the capital's counterpart to Emaar. For an under-construction building, that lowers the risk of delivery slipping.

Inside the building

Panoramic sea views, and a mid-rise scale — less strain on the lifts and typically a lower service charge than in a tower.

Materials from the selling side at launch: the surroundings, the payment term and the developer.

Handover payment

A mortgage covers the final instalment

The final payment on this building falls in 2028 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.

  • Up to 80% of the appraised value, no extra down payment
  • 3.99% fixed for three years, up to 25 years in term
  • 6–12 months before the keys — the bank wants six months of income history

Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.

Ask on WhatsApp

Frequently asked about Manarat Living III

Who is the developer of Manarat Living III?

Aldar.

When is Manarat Living III handed over?

The developer's brochure says Q3 2028. The date in the contract for a particular unit can differ — I check it before the deal.

How much does an apartment in Manarat Living III cost?

The database currently holds 2 lots in this project, from 1 800 000 AED; 2 of them priced below the market, the deepest discount 5%. Prices move every day, so it is worth asking for the current list for this building.

In the news

What has been written about the building, its developer and Saadiyat Island

Where this project stands today

I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram