Photos and renders of the building and grounds — not of this particular unit.
1 / 3
Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
Developer prices
These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
1 bedroom — 15 lots
from AED 1 851 490 765–1 692 sqftas of 1 June 2026
2 bedrooms — 19 lots
from AED 3 143 153 1 330–3 798 sqftas of 1 June 2026
Handover
Q2 2026
Developer
BNW Developments
Figures come from the developer's own materials sent to brokers, dated 1 June 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
A residential building in Business Bay, currently under construction. Developer — BNW Developments.
Specifications for Ramada Residences by BNW per Propsearch and the Dubai Land Department.
They describe the whole building, not the individual unit.
About the project
Ramada Residences by BNW is a residential building in Business Bay, the announced handover date, Q2 2026, has already passed.
The developer is BNW Developments.
Layouts, according to the developer's brochure — 1 and 2 bedrooms.
No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.
A 108-apartment BNW building in Business Bay with handover promised for Q2 2026: the date has passed, and the 1 June inventory still had 34 unsold units.
What it is
Ramada Residences by BNW is a residential building by BNW Developments in Business Bay: 108 apartments, configuration 2B+G+15+R — two basement levels, ground floor, 15 residential floors and a roof. Layouts are one- and two-bedroom.
The 1 June 2026 inventory lists 15 one-bedrooms from AED 1,851,490 at 765–1,692 ft² and 19 two-bedrooms from AED 3,143,153 at 1,330–3,798 ft².
Handed over or delayed?
The stated handover was Q2 2026. That has passed, the passport still says "under construction", and the developer has published no update. Whether the building is finished or running late has to be checked on site and in the documents, not in the brochure.
The size spread here is the widest in BNW's portfolio: two-bedrooms run from 1,330 to 3,798 ft², almost threefold. "From AED 3,143,153" and the top of the range at AED 5.77 million are different apartments, not different floors, so compare only unit by unit.
Business Bay in our stock: 376 lots, median AED 3.5 million at AED 2,849/ft². There are no open listings in this building right now.
BNW Developments inventory to brokers as of 1 June 2026: 34 unsold units out of 108 apartments, types, sizes, starting prices, handover date, configuration. No propsearch passport. Our stock as of 21 September 2026: no lots in the building; Business Bay median and price per ft².
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
Listings for Ramada Residences by BNW do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Business Bay.
The final payment on this building falls in 2026 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The developer's brochure says Q2 2026. That date has already passed and the developer has published no update: whether it was handed over or is running late, I check on site before the deal.
What layouts are there in Ramada Residences by BNW?
1-bedroom and 2-bedroom, according to the developer's brochure. Which sizes are actually free right now depends on what is on the market; I will send the current list.
Where is Ramada Residences by BNW?
Business Bay. The canal district next to Downtown: conceived as offices, built mostly as apartments, now one of the most tenanted parts of the city.
How much does an apartment in Ramada Residences by BNW cost?
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
Business Bay recorded 14 prime transactions in August 2026 against Palm Jumeirah's 10 — while Dubai-wide transaction volume fell 37% year-on-year and value fell 44%. Rental search demand rose 44% over the same period. What these seemingly contradictory numbers actually mean.
Corinthia Dubai, twin towers above 500 m on Sheikh Zayed Road with a rooftop pool and a Corinthia hotel, is due by 2030. Al Habtoor Group has announced an AED 5bn ($1.36bn) office tower in Al Habtoor City. What the two projects say about the market and who should care.
Omniyat bought a reclaimed island in Marasi Bay to build the Burj Khalifa district's only urban beach club and Sunset Park, a private floating island for VELA Viento residents. In March 2026 it priced a $600m sukuk at 7.25% and said its $11.7bn launched portfolio is fully funded to completion.
Deyaar is building DWTN (Downtown) Residences in Business Bay: twin 445 m, 111-storey towers with 522 homes — 432 apartments, 76 duplexes, 13 penthouses and a “Royal Palace”. From AED 1.86m with half due at keys. Construction began in January 2026; completion is quoted for 2029–2030.
In October 2024 Binghatti said it would lift its portfolio from about AED 40bn to AED 100bn ($27.2bn) in 18 months. In 2025 revenue reached AED 12.43bn, more than 17 000 units were sold, and the AED 30bn Binghatti City launched in Nad Al Sheba. What the growth means for buyers.
Downtown is Dubai's tourist and status core, around AED 2 433/sqft on our own data. Business Bay is the business district next door, home to 17 000+ companies, around AED 1 871/sqft. We compare lifestyle, rental economics and who should pick which.
SOM designed Burj Khalifa and a 74-metre metro station in Creek Harbour that will be the tallest in the world. Zaha Hadid Architects built The Opus and is now building Oystra in Ras Al Khaimah. What separates a real premium from a marketing line.
Three major office schemes are rising around DIFC and Business Bay: Immersive Tower ($300m, 58 573 sq m, 2027), Aldar's 88 000 sq m tower by Emirates Towers metro (Q4 2027), and an office park with a theatre on Business Bay's largest plot. Vacancy in central clusters sits at 2–5%.
The RTA and Dubai Holding signed an AED 6bn (about $1.6bn) road programme: four new JVC access points with interchanges, double the capacity and 70% shorter journeys. Hessa Street phase two adds a 780 m bridge and a 480 m tunnel out of JVC. What it means for owners and buyers.
Where this project stands today
Message me for the free layouts in Ramada Residences by BNW, the real entry price and what owners and tenants say — not the brochure copy.