Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
Developer prices
These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
1 bedroom — 16 lots
from AED 1 857 820 702–1 017 sqftas of 1 June 2026
2 bedrooms — 5 lots
from AED 3 273 843 993–1 627 sqftas of 1 June 2026
3 bedrooms — 1 lot
from AED 8 206 360 3 821 sqftas of 1 June 2026
4 bedrooms — 1 lot
from AED 10 684 559 5 122 sqftas of 1 June 2026
Handover
Q4 2027
Developer
BNW Developments
Figures come from the developer's own materials sent to brokers, dated 1 June 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
A residential building in Al Marjan Island, currently under construction. Developer — BNW Developments.
Specifications for Aqua Maya per Propsearch and the Dubai Land Department.
They describe the whole building, not the individual unit.
About the project
Aqua Maya is a residential building in Al Marjan Island, handover is due Q4 2027.
The developer is BNW Developments.
Layouts, according to the developer's brochure — 1, 2, 3 and 4 bedrooms.
The database has nothing for this project at the moment: lots come and go here, and it refreshes nightly.
A 99-apartment BNW building on Al Marjan Island due in Q4 2027: our stock has a 3,820 ft² three-bedroom at a 39% discount.
What it is
Aqua Maya is a residential building by BNW Developments on Al Marjan Island in Ras Al Khaimah, configured 2B+G+9+R, with 99 apartments. It's under construction, with handover per the brochure in Q4 2027.
Layouts run from one to four bedrooms. As of 1 June 2026 the developer had 23 of the 99 units still available.
BNW's cheapest way onto the island
One-bedrooms make up most of the remainder — 16 units from AED 1,857,820 at 702–1,017 ft²; according to the developer, that's the lowest entry in its Al Marjan portfolio.
The rest: two-bedrooms — 5 units from AED 3.27 million (993–1,627 ft²), one three-bedroom from AED 8.21 million at 3,821 ft² and one four-bedroom from AED 10.68 million at 5,122 ft².
These are starting prices as of the inventory date; off-plan prices are revised several times a year.
What's in our stock
As of 21 September 2026 we have two lots: a three-bedroom of 3,820 ft² at AED 4,899,000 (−39%) and a two-bedroom of 1,614 ft² at AED 3,480,000 (−13%).
The developer's three-bedroom of almost the same size started at AED 8.21 million in June — a gap far larger than a normal resale discount, and its reason is worth finding out before you negotiate.
Sales terms in autumn 2025
In October 2025 the project was offered on an interest-free 50/50 plan — half during construction, half on handover. Entry then started at about AED 1.78 million (around $485,000), with completion set for Q4 2027.
Apartments and penthouses with private pools and family terraces were on sale; shared facilities include a pool, gym, barbecue areas and retail at ground level.
BNW inventory to brokers, 1 June 2026: 23 of 99 units available, starting prices and sizes, configuration 2B+G+9+R. Our stock as of 21 September 2026: two lots (price, size, discount). Payment plan, entry price and product mix — sales announcements, October 2025.
Nothing in the stock for this project right now
The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Al Marjan Island.
The final payment on this building falls in 2027 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The developer's brochure says Q4 2027. The date in the contract for a particular unit can differ — I check it before the deal.
What layouts are there in Aqua Maya?
1-bedroom, 2-bedroom, 3-bedroom and 4-bedroom, according to the developer's brochure. Which sizes are actually free right now depends on what is on the market; I will send the current list.
How much does an apartment in Aqua Maya cost?
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
Wynn Al Marjan Island has unveiled its two largest suites, the Mayfair Apartment and the Paris Apartment, each about 1 460 sq m with seven bedrooms on the top floors of its 70-storey tower. They are hotel suites, not homes for sale. What they signal for Al Marjan property.
Ras Al Khaimah targets 3.5m visitors a year by 2030 (1.35m in 2025), wants to grow hotel stock from 8 700 to about 16 000 keys with 80% premium, and is building a terminal for 3m passengers by 2028. What it means for property buyers.
Wynn Al Marjan Island now opens in September 2027 instead of Q1, and the budget is up $600m to about $5.7bn. Licence granted by the GCGRA in October 2024, $2.4bn construction loan closed in February 2025. What the delay means for Al Marjan investors.
RAK Properties closed 2024 with revenue of AED 1.41bn (+40%) and net profit of AED 280.9m (+39%), but withheld its dividend to speed up construction ahead of the $5.1bn Wynn Al Marjan Island resort, now targeting a September 2027 opening. What it means for buyers on Al Marjan Island.
Ras Al Khaimah is building its own vertiport by Al Marjan Island, Uber and WeRide are already carrying driverless passengers in Jumeirah, and Abu Dhabi has signed on for electric Seaglider service. Status as of September 2026 on all three.
Ardee has poured foundations for its AED 2bn Fairmont Residences, while Richmind's Oystra — with a curved steel truss designed by Zaha Hadid Architects — sold out its first phase and launched a second. Here is what is actually under construction on the island next to the Wynn resort.
Ras Al Khaimah Municipality registered about AED 2.89bn ($787m) of property transactions in January–June 2026: AED 1.35bn of sales, AED 1.16bn of mortgages and AED 0.38bn of transfers without payment. CBRE puts apartment prices up 18% on the year, and 23% on Al Marjan Island.
Wynn Al Marjan opens in September 2027, and branded homes around it deliver in the same window: W Residences from AED 1m, Jacob & Co Residences (223 units, AED 300m sold in 12 hours), 141 Sheraton residences and Park Beach Residences 2. Where the risk sits.
Ras Al Khaimah is building the country’s first integrated casino resort, and Al Marjan Island is being reshaped around it. Ready-to-buy commercial units are almost nowhere to be found — and that’s its own investment story.
Where this project stands today
Message me for the free layouts in Aqua Maya, the real entry price and what owners and tenants say — not the brochure copy.