Tiger Properties: volume at the low end, and how to check a delivery record
One of the oldest builders in the affordable segment. What a low entry price is built from, and the specific checks that matter more here than anywhere else in the market.
JVT District 2 · Tiger Properties
Located in JVT District 2, completed in 2025. Developer — Tiger Properties.
Cloud Towers is a residential complex of several buildings in JVT District 2, completed in 2025.
The developer is Tiger Properties.
The tallest tower rises 34 storeys.
The database has nothing for this project at the moment: lots come and go here, and it refreshes nightly.
Thirty-four storeys by Tiger Properties in JVT, handed over in 2025. Price per square foot is AED 1,581 — below the district figure.
Cloud Towers is a Tiger Properties residential complex with 34 storeys in Jumeirah Village Triangle, handed over in 2025. The number of residences isn't listed in the building record.
Our own stock has one lot of about 563 square feet for AED 890,000, a price of AED 1,581/ft².
The blocks Cloud Tower Block A and Block B appear in our database as separate entries — 229 and 218 residences.
Cloud Towers runs below the JVT average, while the under-construction Lilium by the same developer runs above it.
| District | Lot median | AED per ft² | Lots |
|---|---|---|---|
| Dubai Science Park | AED 2.20 million | 1888 | 11 |
| JVT | AED 0.89 million | 1848 | 22 |
| Dubai Sports City | AED 5.00 million | 1865 | 15 |
| DubaiLand | AED 2.04 million | 1761 | 11 |
| Motor City | AED 4.38 million | 1655 | 12 |
| Majan | AED 0.97 million | 1618 | 12 |
| Arjan | AED 1.15 million | 1614 | 36 |
| Al Furjan | AED 4.45 million | 1604 | 82 |
| Dubai Production City | AED 1.00 million | 1482 | 6 |
| JVC | AED 1.24 million | 1474 | 276 |
| Town Square | AED 2.20 million | 1455 | 12 |
| Al Barsha | AED 3.36 million | 1373 | 12 |
| International City | AED 0.90 million | 1243 | 1 |
| Dubai Silicon Oasis | AED 3.31 million | 1229 | 6 |
| Sports City | AED 0.70 million | 1083 | 5 |
Our stock as of 28 August 2026. The per-square-foot spread within the belt is 1.7x, while the gap between the belt and Bluewaters (6,717) is sixfold. The median and the price per square foot diverge: a high median means large lots, not an expensive district.
JVT in our database totals 22 lots, with a median of AED 890,000 and a price of AED 1,848/ft².
Cloud Towers, handed over in 2025, runs at AED 1,581/ft²; the under-construction Lilium by the same developer runs at AED 1,946. The completed building is 19% cheaper.
It's usually the other way around — in Sobha Hartland, we measured a premium of 10–15% for completed stock. Here the difference comes down to size: 563 square feet against 381. The more compact lot costs more per square foot, and that outweighs the effect of construction stage.
You can only compare completed and under-construction stock by price per square foot at matching sizes — otherwise the lot size swamps everything else.
Propsearch building record: 34 storeys, developer Tiger Properties, handed over 2025. Our stock as of 28 August 2026: the project's lot (size, price, price per square foot), figures for Lilium Tower and the Cloud Tower blocks, medians and price per square foot for the affordable belt.
In 2025 the Dubai Land Department registered 134 sales in Cloud Towers, at a median price of AED 760 504 (AED 1 202 per sq ft). Another 51 have been registered since the start of 2026.
| Year | Sales | Median price | AED/sqft | Total value |
|---|---|---|---|---|
| 2025 | 134 | AED 760 504 | 1 202 | AED 109.1m |
| 2026, to 18 November | 51 | AED 900 000 | 1 432 | AED 48.6m |
Registered sales of all property types; 2026 is a partial year. Medians, not averages; with fewer than 5 sales no price is quoted. Off-plan share of sales over the last 12 months: 2%.
| Type | Annual rent | Contracts | Gross yield |
|---|---|---|---|
| Studios | AED 45 000 | 914 | 7.8% |
| 1-bedroom | AED 69 477 | 1 290 | 7.2% |
| 2-bedroom | AED 85 000 | 454 | 5.3% |
| 3-bedroom | AED 180 000 | 80 | 6.9% |
| 4-bedroom | AED 225 000 | 23 | — |
Median Ejari contract (November 2025 — October 2026) across the whole community rather than this building: rents are not published building by building. Gross yield — before service charges, vacancy and fees.
Between November 2024 and September 2026 the median price per sq ft moved from AED 1 178 to AED 1 383 (+17.4%).
Monthly median of registered sales, ready and off-plan together; months with fewer than five sales are left out.
| Date | Unit | Status | Size, sq ft | Price | AED/sqft |
|---|---|---|---|---|---|
| 16/11/2026 | Apartment, 1-bedroom | ready | 628 | AED 908 000 | 1 447 |
| 02/11/2026 | Apartment, 1-bedroom | ready | 563 | AED 785 000 | 1 394 |
| 30/10/2026 | Apartment, 2-bedroom | ready | 945 | AED 1 290 000 | 1 365 |
| 15/10/2026 | Apartment, 1-bedroom | ready | 564 | AED 780 000 | 1 382 |
| 01/10/2026 | Apartment, 2-bedroom | ready | 950 | AED 1 450 000 | 1 526 |
| 29/09/2026 | Apartment, 2-bedroom | ready | 1 473 | AED 1 910 000 | 1 297 |
| 29/09/2026 | Apartment, 1-bedroom | ready | 563 | AED 820 000 | 1 456 |
| 17/09/2026 | Apartment, 1-bedroom | ready | 564 | AED 750 000 | 1 329 |
| 17/09/2026 | Apartment, 1-bedroom | ready | 651 | AED 923 000 | 1 419 |
| 07/09/2026 | Apartment, 2-bedroom | ready | 940 | AED 1 300 000 | 1 383 |
| 31/08/2026 | Apartment, 1-bedroom | ready | 553 | AED 800 000 | 1 446 |
| 26/08/2026 | Apartment, 1-bedroom | ready | 563 | AED 669 000 | 1 188 |
| 25/08/2026 | Apartment, 1-bedroom | ready | 651 | AED 923 000 | 1 419 |
| 24/08/2026 | Apartment, 1-bedroom | ready | 635 | AED 900 000 | 1 418 |
| 27/07/2026 | Apartment, 1-bedroom | ready | 742 | AED 975 000 | 1 315 |
| 23/07/2026 | Apartment, studio | ready | 399 | AED 570 000 | 1 430 |
| 13/07/2026 | Apartment, studio | ready | 379 | AED 525 000 | 1 384 |
| 10/07/2026 | Apartment, 3-bedroom | ready | 2 025 | AED 2 350 000 | 1 160 |
| 08/07/2026 | Apartment, 2-bedroom | ready | 940 | AED 1 366 000 | 1 453 |
| 07/07/2026 | Apartment, 1-bedroom | ready | 584 | AED 800 000 | 1 371 |
| 29/06/2026 | Apartment, 1-bedroom | ready | 740 | AED 1 050 000 | 1 418 |
| 26/06/2026 | Apartment, 1-bedroom | ready | 553 | AED 890 000 | 1 609 |
| 04/06/2026 | Apartment, 1-bedroom | ready | 554 | AED 900 000 | 1 625 |
| 25/05/2026 | Apartment, 2-bedroom | ready | 945 | AED 1 083 535 | 1 147 |
Buyer, seller and unit number are not part of the Land Department open data.
Source: Dubai Data (calculated from Dubai Land Department open data), data to 18 November 2026.
Listings for Cloud Towers do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in JVT District 2.
Ask about this projectTiger Properties.
34 — that is the tallest building of the complex.
Handed over: 2025. The property is complete, so after the deal you can move in or put it on the rental market at once.
JVT. The same idea as JVC, two storeys lower and considerably calmer: a grid of quiet streets where a townhouse costs what an apartment costs closer in.
There are no open listings for this building in the database right now. I will check the price for a particular layout against the closed databases and send it with the deal costs worked out.
Parking, Shops, Park and landscaping. The list comes from the project description and covers the whole complex.
What has been written about the building, its developer and JVT District 2
One of the oldest builders in the affordable segment. What a low entry price is built from, and the specific checks that matter more here than anywhere else in the market.
Message me for the free layouts in Cloud Towers, the real entry price and what owners and tenants say — not the brochure copy.
Telegram is the fastest way — I answer personally.
Message on Telegram