Photos and renders of the building and grounds — not of this particular unit.
1 / 6
Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
About the building
A residential building in Emaar South, currently under construction. Developer — Emaar.
About the project
Golf Edge is a residential building in Emaar South, handover is due Q1 2029.
The developer is Emaar.
There is not a single lot in this project in the database right now — it is refreshed every night, and listings here appear and go.
A 14-storey Emaar building and two-storey townhouses in Emaar South with golf course views. Twenty parks in the community, five minutes to Al Maktoum Airport.
The golf course view
A golf course, like a nature reserve, is a guarantee the view won't be built over: the land can't be developed by definition.
In districts still being built out, that guarantee is worth a lot. Check the floor plan to see which side a specific lot faces — the view premium is usually already baked into the price.
Two formats in one project
Apartments in the 14-storey building and standalone two-storey townhouses. These are different products with different economics: a townhouse costs more per unit, but it has its own entrance, its own plot, and no neighbours through the wall above.
For rental, an apartment is more liquid; for family living, a townhouse is more comfortable. Having both in one project is rare, and that's its advantage.
Location and developer
Emaar South is Emaar's own master community next to Al Maktoum Airport, around which the entire south of Dubai is being built. Twenty parks, a pool, sports courts and running tracks.
Emaar is the city's top developer by deal value: AED 30.6 billion over seven months. One company builds both the homes here and the surrounding infrastructure.
Selling-side materials at sales launch: storey count, formats, surroundings. Developer data — market summary report for January–July 2026.
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
Listings for Golf Edge do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Emaar South.
The final payment on this building falls in 2029 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The developer's brochure says Q1 2029. The date in the contract for a particular unit can differ — I check it before the deal.
Where is Golf Edge?
Emaar South. Emaar South is Emaar’s golf community inside Dubai South, next to Al Maktoum International Airport: townhouses, villas and low-rise apartment blocks around a golf course.
How much does an apartment in Golf Edge cost?
Our database has no open listings for Golf Edge at the moment. I will check the price of the layout you want against the closed databases and send it together with the deal costs.
October 2026: Dubai sales reached AED 35.01bn, up 18% on the month, and Abu Dhabi home sales AED 12.97bn, up 30%. Emaar offers AED 15 a share for Emaar Development. Dubai logged 339,557 leases in ten months. Plus Ejari on DubaiNow, Nakheel’s Palm Springs and new Al Reem launches.
At Bloomberg Invest on 12 November 2026 Mohamed Alabbar said construction costs are up about 5%, footfall in Emaar malls is down 10% and hotel occupancy fell from 80% to 65%. Contractors are still delivering on time; the tender for a big tower is on hold.
Emaar Properties has offered AED 15 a share for the 20.84% of Emaar Development it does not own — about AED 12.5bn, valuing the unit at roughly AED 60bn. The offer runs to 10 December 2026. Here is what it changes for people buying Emaar homes.
Emaar is offering buyers of homes from AED 2 million a Golden Visa voucher of up to AED 22,500 for the buyer and two family members, seven nights at Address Creek Harbour and access to Emaar entertainment venues.
Q3 2026: 10,055 resale deals in Dubai lifted ready homes to 29% of sales. ValuStrat’s September index slipped just 0.1%. S&P Global expects 20% more homes in two years, and the IMF sees UAE growth of 7.7% in 2027. Plus Aldar and Ritz-Carlton launches, visas and schools.
S&P Global expects Dubai’s housing stock to grow by about 20% over two years, mostly apartments. Deliveries due in 2027–2028 could accelerate price corrections in investor-driven segments. What it means for off-plan buyers.
S&P Global Ratings has affirmed Emaar Properties at BBB+ with a stable outlook. At 30 June 2026 the developer had AED 164.9bn ($44.9bn) of revenue backlog from homes sold but not yet handed over, and its malls were about 98% occupied.
September 2026: 11,430 sales worth AED 29.66bn, about 44% fewer than a year earlier but 9.9% higher than August by value. Ready homes took 54% of the money, off-plan 65% of the deals. Nine-month sales reached AED 379.4bn.
The ValuStrat Price Index stood at 218.8 in August 2026: down 0.2% on the month and 3.1% on the year. Villas fell 1.7% year on year, the first annual decline since 2021; apartments fell 5.3%. Ready sales 3 038, off-plan 8 016.
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.