Located in Dubai Islands. Developer — Ellington Properties Development. Architect — Brewer Smith Brewer Group.
What the building has
Gym
24/7 security
Shops
Restaurants
Beach
About the project
Ellington Sands is a residential complex of several buildings in Dubai Islands, currently under construction.
The developer is Ellington Properties Development. The architecture is by Brewer Smith Brewer Group.
The tallest tower rises 8 storeys.
The database currently holds 1 lot in this project, from 1 800 000 AED.
Eight storeys from Ellington on Dubai's islands, under construction. A lot in our own stock is priced at AED 1.8 million.
What this is
Ellington Sands is an 8-storey residential building by Ellington Properties on Dubai Islands. Status: under construction. The number of residences is not listed in the building record.
In our own stock, a unit is listed at AED 1.8 million; the size isn't given, so we don't quote a price per square foot.
The second phase, Ellington Sands II, is priced at AED 2,971 per square foot — the top line of the islands in our sample.
Price per square foot by Dubai Islands project
Ellington Sands II tops the islands list; for the first phase, the size isn't given for our lot.
Price per square foot by Dubai Islands project — our own stock
Project
AED / ft²
Lots
Avg. size
Ellington Sands II
2971
3
1466 ft²
Bay Grove Residences
2739
4
1282 ft²
Bay Grove Residences C
2504
6
1814 ft²
Rixos Dubai Islands
2404
5
2604 ft²
Bay Grove Residences B
2384
3
1831 ft²
Bay Villas (standalone)
1863
5
6600 ft²
Bay Villas (townhouses)
1785
4
3728 ft²
Bay Villas
1696
17
4982 ft²
Our own stock as of 28 August 2026: 89 lots across the islands, median AED 5.4 million, average price per square foot AED 2,300. Includes projects with three or more lots and a verified area.
A low-rise signature on a new island
Dubai Islands in our database: 89 lots, median AED 5.4 million, average price per square foot AED 2,300.
Ellington is recognisable by its low rise and its finishes: eight storeys here, thirteen at Kensington Waters, fifteen at Wilton Terraces, fourteen at Ellington House 4.
On the islands that sets it apart from developers putting up 15- to 17-storey towers. The product comes out intimate, and the second phase carries the highest price per square foot in the district.
What needs checking here isn't the building but the district: the islands' infrastructure is still being built, and the first owners spend several years living on a construction site.
The propsearch building record: 8 storeys, developer Ellington Properties, status "under construction." Our own stock as of 28 August 2026: the project's lot (price), figures for Ellington Sands II, the calculation across island projects, and the Dubai Islands median and average.
Registered sales across the project
In 2025 the Dubai Land Department registered 338 sales across the 2 phases of Ellington Sands, worth AED 1.1bn in total. Another 525 followed in 2026. Each phase has its own median price, listed in the table below.
Sales by year — Dubai Land Department register
Year
Sales
Total value
2025
338
AED 1.1bn
2026, to 18 November
525
AED 1.7bn
Registered sales of all property types; 2026 is a partial year. Medians, not averages; with fewer than 5 sales no price is quoted.
By phase
Phase
Sales 2025
Median 2025
Sales 2026
Median 2026
I
150
AED 3 245 828
284
AED 3 160 828
II
188
AED 3 136 828
241
AED 3 246 328
Each phase is registered as a separate project. There is no single median for the whole development: medians cannot be added up, only sale counts and values can.
Source: Dubai Data (calculated from Dubai Land Department open data), data to 18 November 2026.
The final payment on this building falls in 2028 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
Ellington Properties Development. The architecture is by Brewer Smith Brewer Group.
How many floors does Ellington Sands have?
8 — that is the tallest building of the complex.
When is Ellington Sands handed over?
The project is under construction. I check the exact date for a particular unit in the contract before the deal.
Where is Ellington Sands?
Dubai Islands. The reclaimed islands off Deira, formerly Deira Islands: beaches, hotels and new residential on the northern coast.
How much does an apartment in Ellington Sands cost?
The database currently holds 1 lot in this project, from 1 800 000 AED. Prices in the base are live and update every day; ask for the current list for the building before deciding.
What is on site at Ellington Sands?
Gym, 24/7 security, Shops, Restaurants, Beach. The list comes from the project description and covers the whole complex.
SHIONE is Beyond’s second residential project in the SIORA master plan on Dubai Islands: two towers, 603 residences, AED 3bn in value. One-bedroom units launched from about AED 2.7m on a 50/50 payment plan, with handover expected in 2030.
Eight UAE megaprojects and what each means for property: Al Maktoum airport at 260m passengers, the 900 km Etihad Rail, Palm Jebel Ali with 90 km of coast, the Metro Blue Line, Dubai Islands, the $5.7bn Wynn resort, Saadiyat’s museums and Yas Island.
Nakheel has released Bay Estate, the first community on Island E of Dubai Islands: 357 townhouses and villas plus 60 plots around two swimmable lagoons. A three-bedroom townhouse averages AED 5.9m; handover is estimated for January 2031.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.
A chain of reclaimed islands under a single government master plan. Almost no coastal land with direct beach access is left inside the emirate — and one or two new projects launch here every month. The opportunity and the risk are the same fact.
A developer building on the Dubai Islands. Between handover and the first tenant there is a list of connections and registrations, and every one of them needs someone on the ground.
A developer building on the Dubai Islands. The dirham’s peg to the dollar shapes the currency risk for every foreign buyer — and the transfer mechanics have costs of their own.
A developer building villas on the Dubai Islands. A house bought off-plan on new land combines two kinds of waiting, and they resolve on different timetables.