Skip to content

Burj Azizi

Sheikh Zayed Road · Azizi Developments

Project factsheet

Developer Azizi Developments
Status Under construction
District Sheikh Zayed Road
Handover Q4 2029

Layouts and the handover date come from the developer's brochure in our archive. Prices and payment plans from the same source are deliberately not published: they are dated to when the brochure was issued and do not match today's prices. I will send the current ones over WhatsApp.

About the building

A residential building in Sheikh Zayed Road, currently under construction. Developer — Azizi Developments.

Specifications for Burj Azizi per Propsearch and the Dubai Land Department. They describe the whole building, not the individual unit.

About the project

Burj Azizi is a residential building in Sheikh Zayed Road, handover is due Q4 2029.

The developer is Azizi Developments.

There is not a single lot in this project in the database right now — it is refreshed every night, and listings here appear and go.

A 131-storey, 725-metre tower on Sheikh Zayed Road — by the developer's claim, one of the tallest residential towers in the world. The world's highest spa and pool, a beach club on the 13th floor, an observation deck at 649 metres.

A record as the product

The project sells on height: 725 metres, six lobbies in different styles, a seven-star hotel, a nightclub and a cinema inside.

What follows from that in practice: the upper floors of a tower like this are a one-off item with their own market — few buyers, but unique supply. The lower and middle floors compete with ordinary buildings in the district, where the record height gives more of an image premium than a real advantage.

Second — the timeline. Buildings of this scale take longer to build than ordinary ones and slip schedule more often; factor that in if you're buying to let.

What to ask about the engineering

In super-tall buildings two things are critical: lifts and water pressure. How many lifts serve the residential portion, whether there are transfer floors, how water supply to the upper levels is organised — the answers to these shape day-to-day comfort more than the lobby finish does.

Third — the service charge. Servicing a tower with a record-height pool, a hotel and a club is expensive, and part of that cost lands on residents.

The location

Sheikh Zayed Road, about five minutes to the Burj Khalifa. The city's main business spine, with metro access and steady rental demand from company staff.

Construction progress

The tower was announced in January 2024 as a project worth around USD 1.5 billion with a four-year build; at that point its exact height still had to be agreed with the Dubai authorities. In September 2024 Azizi's founder, Mirwais Azizi, said active construction was under way and put the height at about 725 metres.

In April 2026 the developer signed a USD 299.5 million (about AED 1.1 billion) construction contract for the tower. Beyond the residences, the building is to house a seven-star hotel, a vertical mall and what the developer calls the world's highest observation deck.

Selling-side materials at launch: height, storey count, amenities and surroundings. Project timeline, budget, start of works and construction contract — news on the project, January and September 2024, April 2026.

Where it is

The pin is placed by district — I send the exact address on request.

Nothing in the stock for this project right now

The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Sheikh Zayed Road.

Ask about this project
Handover payment

A mortgage covers the final instalment

The final payment on this building falls in 2029 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.

  • Up to 80% of the appraised value, no extra down payment
  • 3.99% fixed for three years, up to 25 years in term
  • 6–12 months before the keys — the bank wants six months of income history

Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.

Ask on WhatsApp

Frequently asked about Burj Azizi

Who is the developer of Burj Azizi?

Azizi Developments.

When is Burj Azizi handed over?

The developer's brochure says Q4 2029. The date in the contract for a particular unit can differ — I check it before the deal.

Where is Burj Azizi?

Sheikh Zayed Road. Not a district but an address: the wall of towers along the city's main highway, bought for the view, the metro and ten minutes to everything.

How much does an apartment in Burj Azizi cost?

No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.

In the news

What has been written about the building, its developer and Sheikh Zayed Road

Where this project stands today

I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram