Burj Azizi: a 725-metre tower on Sheikh Zayed Road, set to be the world’s second tallest
Azizi Developments is building a 725-metre skyscraper on Sheikh Zayed Road for $1.5bn: a seven-star hotel, a vertical mall and an observation deck at 649 metres — higher than Burj Khalifa’s. Completion in 2029, apartments from AED 8.6m.
Burj Azizi is under construction on Sheikh Zayed Road — a 725-metre skyscraper by Azizi Developments costing $1.5 billion. If completed on schedule it becomes the second-tallest building in the world. Handover is planned for 2029; Malaysia's Eversendai has already won the $299 million steel structure contract and work is running to plan.
What is inside
- A seven-star hotel, residential apartments and penthouses.
- A vertical shopping mall — a format Dubai has trialled in other towers.
- An observation deck at 649 metres — higher than the Burj Khalifa's.
- Pricing: apartments reportedly start around AED 8.6 million (about $2.3 million); penthouses reach $34 million.
The height race and what it means
The open question is whether Burj Azizi takes second place at all: Jeddah Tower, over a kilometre tall, is being completed in Saudi Arabia. For a buyer that race matters less than it appears, and here is why.
Supertall towers are their own asset class with their own economics. Upper floors sell on the view, and that view cannot be reproduced — nobody can build it next door. But height has a flip side: operating costs. Lift systems, façade maintenance, engineering and fire-safety systems in a supertall cost more per square metre, and that lands in the service charge for the whole holding period.
Talk to a licensed broker: 📲 +971 50 120 32 64 on WhatsApp, @dubai_oleg on Telegram
What to ask before reserving
- Which floor and which view. In a tower this tall, the 30th and the 100th floor are different products in both price and liquidity.
- The maintenance budget. Find the supertall's service charge rate in advance and compare it with an ordinary tower in the same district.
- Timeline and phasing. 2029 means four years of waiting. A steel contractor in place and a confirmed schedule are good signs, but an off-plan purchase at this scale calls for scrutiny of the developer's delivery record.
- What is around it. Sheikh Zayed Road is the city's main artery — excellent connectivity and, simultaneously, noise and traffic. Irrelevant on the upper floors, material on the lower ones.
Based on official Azizi Developments materials and construction progress reports.
In the news
Other write-ups on the site about the same thing.
Chelsea Residences: DAMAC building the world’s highest rooftop football pitch in Dubai
DAMAC and Chelsea FC are building Chelsea Residences in Dubai Maritime City: six 130-metre towers, over 1 400 apartments and a rooftop football pitch billed as the world’s highest. A look at the project — and at how to price a branded residence.
Manchester City Yas Residences: A Sports-Branded Community on Yas Island
Ohana Development is building the UAE's first waterfront community branded by Manchester City football club on Yas Island: around 2 000 units led by villas, a football pitch, an academy and 500 000+ sqm of green space.
Dubai skyscrapers: Corinthia Dubai above 500 metres and Al Habtoor’s AED 5bn tower in Al Habtoor City
Corinthia Dubai, twin towers above 500 m on Sheikh Zayed Road with a rooftop pool and a Corinthia hotel, is due by 2030. Al Habtoor Group has announced an AED 5bn ($1.36bn) office tower in Al Habtoor City. What the two projects say about the market and who should care.
Hudayriyat Island, Abu Dhabi: Modon’s masterplan, Nawayef and Bashayer, and what people are actually buying
Hudayriyat is a 3 000+ hectare island off Abu Dhabi’s southern shore that state developer Modon is turning into a sports and residential district. Nawayef Village’s 378 townhouses (about AED 2bn) sold out on launch day; Bashayer sold roughly AED 3bn in a day in December 2025.
RAK Central: Ras Al Khaimah’s first business district — Marjan’s 4 000 apartments and Grade A offices by 2027
State developer Marjan is building RAK Central next to Al Hamra: over 4 000 apartments, five Grade A office towers for 6 000+ staff and 1 000+ hotel keys. Every plot sold out in 15 months; the office core opens around 2027, the full district by 2030.
Dubai skyscrapers: how the skyline grew from the 1979 World Trade Centre to Burj Azizi
In 1979 Dubai's tallest building was the 149-metre World Trade Centre. Today the UAE has 37 towers above 300 metres — second only to China's 122 and ahead of the US with 31. Five record holders, what comes next, and what height means for a buyer.





