Photos and renders of the building and grounds — not of this particular unit.
1 / 6
Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
Developer prices
These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
1 bedroom — 220 lots
from AED 1 913 304 695–782 sqftas of 2 June 2026
2 bedrooms — 225 lots
from AED 2 562 048 921–1554 sqftas of 2 June 2026
Developer
Sobha Realty
Figures come from the developer's own materials sent to brokers, dated 2 June 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
A residential building in Sheikh Zayed Road, currently under construction.
Specifications for The Horizon at Sobha Central per Propsearch and the Dubai Land Department.
They describe the whole building, not the individual unit.
About the project
The Horizon at Sobha Central is a residential building in Sheikh Zayed Road, handover is due Q4 2029.
The database has nothing for this project at the moment: lots come and go here, and it refreshes nightly.
A skyscraper with 75 residential storeys in a six-tower complex on Sheikh Zayed Road, five minutes from Dubai Marina. A suspension bridge from the podium feeds cars straight onto the highway, with internal access to a mall, a cinema and clinics.
What's unusual here
A suspension bridge for exiting onto the highway, and internal mall access without stepping outside — both are solutions dictated by the address. Sheikh Zayed Road is a sixteen-lane artery, and a normal podium exit turns into a problem at rush hour.
The podium is stated to hold a park with a football pitch, running tracks, fountains and gardens — 23,000 square metres of greenery and 15,000 of retail across the whole complex.
Metro and the highway
A metro station steps away — for a building on the city's main artery that's a key advantage: some tenants will be able to do without a car.
The flip side of the address is noise and view. Units facing the highway look out onto a sixteen-lane flow. Choose the side of the building deliberately, not by floor number.
Developer and terms
Sobha is known for build quality — the company constructs with its own crews rather than through subcontractors, unusual for the Dubai market. The instalment plan is stated at four and a half years.
Selling-side materials at launch: storey count, complex composition, common-area sizes and the instalment term.
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
Listings for The Horizon at Sobha Central do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Sheikh Zayed Road.
The final payment on this building falls in 2029 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
Frequently asked about The Horizon at Sobha Central
When is The Horizon at Sobha Central handed over?
The developer's brochure says Q4 2029. The date in the contract for a particular unit can differ — I check it before the deal.
Where is The Horizon at Sobha Central?
Sheikh Zayed Road. Not a district but an address: the wall of towers along the city's main highway, bought for the view, the metro and ten minutes to everything.
How much does an apartment in The Horizon at Sobha Central cost?
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
Corinthia Dubai, twin towers above 500 m on Sheikh Zayed Road with a rooftop pool and a Corinthia hotel, is due by 2030. Al Habtoor Group has announced an AED 5bn ($1.36bn) office tower in Al Habtoor City. What the two projects say about the market and who should care.
In January 2025 DLD allowed owners of 457 private plots — 128 on Sheikh Zayed Road and 329 in Al Jaddaf — to convert them to freehold for all nationalities, for a fee of 30% of the valuation based on gross floor area. What it means for apartment buyers.
In 1979 Dubai's tallest building was the 149-metre World Trade Centre. Today the UAE has 37 towers above 300 metres — second only to China's 122 and ahead of the US with 31. Five record holders, what comes next, and what height means for a buyer.
A corridor of towers along a twelve-lane highway. The address could not be more central, and almost everything here comes down to the floor and the side of the building.
Three major office schemes are rising around DIFC and Business Bay: Immersive Tower ($300m, 58 573 sq m, 2027), Aldar's 88 000 sq m tower by Emirates Towers metro (Q4 2027), and an office park with a theatre on Business Bay's largest plot. Vacancy in central clusters sits at 2–5%.
Azizi Developments is building a 725-metre skyscraper on Sheikh Zayed Road for $1.5bn: a seven-star hotel, a vertical mall and an observation deck at 649 metres — higher than Burj Khalifa’s. Completion in 2029, apartments from AED 8.6m.
Where this project stands today
Message me for the free layouts in The Horizon at Sobha Central, the real entry price and what owners and tenants say — not the brochure copy.