Photos and renders of the building and grounds — not of this particular unit.
1 / 6
Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
Developer prices
These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
1 bedroom — 35 lots
from AED 2 075 383 592–1 118 sqftas of 1 June 2026
2 bedrooms — 6 lots
from AED 4 340 403 1 332–2 541 sqftas of 1 June 2026
3 bedrooms — 9 lots
from AED 6 960 193 2 545–4 576 sqftas of 1 June 2026
4 bedrooms — 4 lots
from AED 14 333 229 4 728–5 631 sqftas of 1 June 2026
Handover
Q2 2028
Developer
BNW Developments
Figures come from the developer's own materials sent to brokers, dated 1 June 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
A residential building in Al Marjan Island, currently under construction.
Specifications for Fashion TV Acacia per Propsearch and the Dubai Land Department.
They describe the whole building, not the individual unit.
About the project
Fashion TV Acacia is a residential building in Al Marjan Island, handover is due Q2 2028.
The database has nothing for this project at the moment: lots come and go here, and it refreshes nightly.
A 13-storey building on Al Marjan in Ras Al Khaimah under the FashionTV brand, ten minutes from the Wynn casino under construction. Balcony pools, architecture by Conin International.
What's for sale
Apartments, duplexes and penthouses. Cascading terraces, an infinity pool linked to the building by a bridge, an observation deck, a restaurant and a hall with a sea view.
A two-year post-handover instalment plan is stated — a convenient term for the Ras Al Khaimah market: the emirate is cheaper than Dubai, and a stretched-out schedule lowers the entry threshold even further.
The casino as a price factor
Wynn Al Marjan is the UAE's first licensed gaming resort, and it's what's heating up the island's market: projects here are selling on the expectation of tourist flow once it opens.
What that means for a buyer: on the upside, short-term rental near a resort of this scale usually commands a higher rate. On the downside and as a risk, prices on the island have already priced in that expectation, and if the opening slips, working off the overpayment could take years.
Check the stage, not the promises: the resort's own opening dates are public and have already shifted more than once.
A different emirate
Ras Al Khaimah is a market separate from Dubai, with its own regulator and its own liquidity. Far fewer transactions go through here, exiting a position takes longer, but the price per square metre is noticeably cheaper than Dubai's.
Selling-side materials at launch: complex composition, architecture and instalment terms.
Nothing in the stock for this project right now
The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Al Marjan Island.
The final payment on this building falls in 2028 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The developer's brochure says Q2 2028. The date in the contract for a particular unit can differ — I check it before the deal.
How much does an apartment in Fashion TV Acacia cost?
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
Wynn Al Marjan Island has unveiled its two largest suites, the Mayfair Apartment and the Paris Apartment, each about 1 460 sq m with seven bedrooms on the top floors of its 70-storey tower. They are hotel suites, not homes for sale. What they signal for Al Marjan property.
Ras Al Khaimah targets 3.5m visitors a year by 2030 (1.35m in 2025), wants to grow hotel stock from 8 700 to about 16 000 keys with 80% premium, and is building a terminal for 3m passengers by 2028. What it means for property buyers.
Wynn Al Marjan Island now opens in September 2027 instead of Q1, and the budget is up $600m to about $5.7bn. Licence granted by the GCGRA in October 2024, $2.4bn construction loan closed in February 2025. What the delay means for Al Marjan investors.
RAK Properties closed 2024 with revenue of AED 1.41bn (+40%) and net profit of AED 280.9m (+39%), but withheld its dividend to speed up construction ahead of the $5.1bn Wynn Al Marjan Island resort, now targeting a September 2027 opening. What it means for buyers on Al Marjan Island.
Ras Al Khaimah is building its own vertiport by Al Marjan Island, Uber and WeRide are already carrying driverless passengers in Jumeirah, and Abu Dhabi has signed on for electric Seaglider service. Status as of September 2026 on all three.
Ardee has poured foundations for its AED 2bn Fairmont Residences, while Richmind's Oystra — with a curved steel truss designed by Zaha Hadid Architects — sold out its first phase and launched a second. Here is what is actually under construction on the island next to the Wynn resort.
Ras Al Khaimah Municipality registered about AED 2.89bn ($787m) of property transactions in January–June 2026: AED 1.35bn of sales, AED 1.16bn of mortgages and AED 0.38bn of transfers without payment. CBRE puts apartment prices up 18% on the year, and 23% on Al Marjan Island.
Wynn Al Marjan opens in September 2027, and branded homes around it deliver in the same window: W Residences from AED 1m, Jacob & Co Residences (223 units, AED 300m sold in 12 hours), 141 Sheraton residences and Park Beach Residences 2. Where the risk sits.
Ras Al Khaimah is building the country’s first integrated casino resort, and Al Marjan Island is being reshaped around it. Ready-to-buy commercial units are almost nowhere to be found — and that’s its own investment story.
Where this project stands today
I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.