Photos and renders of the community and grounds — not of this particular unit.
1 / 7
Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
About the project
241 Waterside Residences is a residential community in Deira, handover is due Q1 2028.
Layouts, according to the developer's brochure — 1, 2 and 3 bedrooms.
No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.
A new build on Dubai Islands due in Q1 2028, with one- to three-bedroom layouts and no building-level passport yet.
What it is
241 Waterside Residences is a project on Dubai Islands; the propsearch passport files that territory under Deira. There is no separate card for the building itself, so storeys, unit count and developer aren't in our data.
The developer's brochure in our archive lists one-, two- and three-bedroom apartments and handover in Q1 2028. We don't quote the brochure prices: they date from when it was issued.
Our stock as of 21 September 2026 has no lots in this building.
Why the district figures say little here
Our district page covers Deira and Bur Dubai together — the old city on both sides of the Creek, densely built at five to twelve storeys. Stock there is just three lots, with a median of AED 3.62 million and AED 2,370 per ft².
Three listings aren't a statistic, and a new waterfront project can't be compared with the blocks of old Deira as a product. The only real price guide is the developer's price list on the day of the deal and registered transactions in neighbouring buildings on the island.
On off-plan, the final instalment usually falls due at handover — here, 2028 — so the money or a mortgage needs to be lined up in advance.
propsearch passport: Dubai Islands territory, Deira district; no passport for the building itself. Developer brochure: 1–3 bedrooms, handover Q1 2028. Our stock as of 21 September 2026: no lots in the building; Deira / Bur Dubai — 3 lots, median and price per ft².
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
Lots for this project come and go, and the stock is topped up nightly. Message me — I will look through the closed bases and find the closest alternatives in Deira.
The final payment on this building falls in 2028 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The developer's brochure says Q1 2028. The date in the contract for a particular unit can differ — I check it before the deal.
What layouts are there in 241 Waterside Residences?
1-bedroom, 2-bedroom and 3-bedroom, according to the developer's brochure. Which sizes are actually free right now depends on what is on the market; I will send the current list.
Where is 241 Waterside Residences?
Deira / Bur Dubai. Old Dubai either side of the Creek: the souks, the abras, the trading city that existed before the towers.
How much does an apartment in 241 Waterside Residences cost?
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
Khor Al Mamzar Beach reopened in May 2026 after a AED 500m upgrade: the region's first floating pedestrian bridge, a 3.6km swimming line, a 300-metre night beach and 5.5km of trails. The Al Mamzar corniche is still finishing, while the 6.6km Jebel Ali Beach is being delivered in phases.
In Dubai’s dense old centre many apartments are rented by several people at once. For the owner that means a higher rent and faster wear — and there are rules worth knowing first.
Where this project stands today
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.