Vida Residences +117%: what the Dubai Marina project statistics actually show
The largest developer’s return to Dubai Marina prompted a look at its earlier projects there. The valuable number in that statistic is not the growth percentage.
Dubai Marina
Photos and renders of the community and grounds — not of this particular unit.
Layouts and the handover date come from the developer's brochure in our archive. Prices and payment plans from the same source are deliberately not published: they are dated to when the brochure was issued and do not match today's prices. I will send the current ones over WhatsApp.
The Residences at the Dubai EDITION is a residential community in Dubai Marina, handover is due Q2 2029.
There is not a single lot in this project in the database right now — it is refreshed every night, and listings here appear and go.
Residences at The Dubai EDITION hotel in Dubai Harbour, handover Q2 2029 per the developer's brochure; the other parameters aren't disclosed in our materials.
The Residences at the Dubai EDITION is a project in Dubai Harbour, Dubai Marina's northern neighbour. From the brochure in our archive we have only the handover date, Q2 2029. We don't publish its prices or payment plan — they aged with the brochure.
The developer, number of floors, unit count and layouts aren't in our file. The propsearch passport the page is linked to describes Dubai Harbour as a whole, not the building.
The Marina is the city's most lived-in rental location: a walkable promenade, metro and tram, JBR beach. Our database has 239 lots in the district, median AED 3.75 million at AED 2,447/ft².
A hotel name in the title usually means branded residences with services from the operator. Which services are included and what they cost isn't in our materials — that's the main question for the developer.
Developer brochure in our archive: handover Q2 2029. Our stock as of 21 September 2026: no lots in the project; Dubai Marina median and price per ft².
The pin is placed by district — I send the exact address on request.
The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Dubai Marina.
Ask about this projectThe final payment on this building falls in 2029 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.
Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.
Ask on WhatsAppThe developer's brochure says Q2 2029. The date in the contract for a particular unit can differ — I check it before the deal.
Dubai Marina. The original high-rise waterfront: a dense forest of towers around a man-made marina, and still the busiest rental market in the city.
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
What has been written about the building, its developer and Dubai Marina
The largest developer’s return to Dubai Marina prompted a look at its earlier projects there. The valuable number in that statistic is not the growth percentage.
A district designed from nothing on a Vancouver waterfront model, built between 2003 and 2008. The numbers behind it, and what a fully man-made location tells you about how value is created in Dubai.
A developer with buildings on both sides of Sheikh Zayed Road. The two districts look interchangeable on a map and behave differently — here is what the price gap actually buys.
A Dubai Marina tower from 2011. In buildings owned mostly by absent investors, decisions stop being made — and the symptoms are visible in an afternoon if you know them.
A Dubai Marina tower completed in 2023. Much of the stock in a newly delivered building is sold on by off-plan investors — and buying from one is its own transaction.
A Dubai Marina tower completed a few years ago. Buildings at this age go through a predictable event that shapes their prices — and it is a buying opportunity if you can see it.
A tall branded tower under construction in Dubai Marina. Infill development in a built-out district has a particular economics — for the buyer and for the neighbours.
The property arm of a large regional engineering and contracting group, with towers in the Marina and on the Palm. What an engineering parent means in a delivered building.
A smaller developer with a mid-2000s Dubai Marina building. Most towers are not landmarks, and valuing an ordinary one is a different exercise — here is how it works.
Message me for the free layouts in The Residences at the Dubai EDITION, the real entry price and what owners and tenants say — not the brochure copy.
Telegram is the fastest way — I answer personally.
Message on Telegram