Photos and renders of the building and grounds — not of this particular unit.
1 / 9
Layouts and the handover date come from the sales-launch announcement; the date
of that announcement is shown next to the prices. It is what the developer
claimed at launch, not a registry record — off-plan, phasing and dates get
revised. I will send the current ones over WhatsApp.
Developer prices
The developer's last quote in our materials is dated 23 April 2026,
which is more than 6 months old, so the sums are not shown
here. I will send the current price list and availability over WhatsApp.
Payment plan
50/50
Handover
Q1 2029
Developer
AVENEW
Figures come from the developer's own materials sent to brokers, dated 23 April 2026. The commentary behind them is written up in the Russian
version of this page.
Floor plans
Floor plans from the developer's own materials. The areas and the unit split on them
were correct when the drawing was issued — check them against the plan attached to
the contract before the deal.
About the building
8-storey residential building in Dubai Islands, currently under construction. Developer — AVENEW.
About the project
Cheval Residences is an 8-storey residential building in Dubai Islands, handover is due Q1 2029.
The developer is AVENEW.
The building holds 99 apartments in total. Layouts, according to the sales-launch announcement — 1, 2 and 3 bedrooms.
No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.
Ninety-nine residences on Dubai Islands managed by British operator Cheval Collection: G+7 plus roof, 85 meters from the water, handover announced for Q1 2029.
Who the operator is, and what that changes
Cheval is a British serviced-apartment operator, based in London, with more than 35 years in the business: fully equipped apartments in premium locations, hotel-level service. The broker placed it between Marriott and Four Seasons — that's their read on the segment, not an official classification.
For a buyer of a branded residence, what matters isn't the name on the building but the management agreement: who maintains the building, at what rates, what's included in service, and on what terms you can rent the apartment out through the operator. All of that is in the documents, not the announcement.
The developer is AVENEW. The building is announced at 99 units, G+7 with a usable rooftop: a low-rise club format, not a tower.
Launch prices and terms
At launch: one-bedrooms AED 2.8–4 million, two-bedrooms AED 5.1–7 million, three-bedrooms AED 8–14 million. Payment plan 50/50 — half during construction, half on handover. The service charge is announced at AED 35–38 per square foot per year.
The service charge deserves separate attention here: AED 35–38 is the level of a branded building with hotel-style service, and it eats a noticeable share of the yield in a return calculation. Calculate after it, not before.
Three days after launch, the building was described as 70% sold. That's the selling side's own claim, not a developer report; with claims like this it's worth asking how many lots — and of which types — are actually still available right now.
Location
Dubai Islands is Dubai's last major island development, and its waterfront cluster is still forming. Direct beach access 85 meters away is a strong position within the island.
The flip side is the same as for the whole island: neighboring plots will keep being built for years after this building is handed over, and what looks like the surroundings on the render will be a construction site by 2029.
Number of units, storeys, distance to water, launch prices, payment plan and service charge — developer materials from the sales launch dated 23 April 2026. Operator Cheval Collection and developer AVENEW — from the same announcement; the segment assessment and sales figure are the announcement author's own words.
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
Listings for Cheval Residences do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Dubai Islands.
The final payment on this building falls in 2029 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The sales-launch announcement says Q1 2029. The date in the contract for a particular unit can differ — I check it before the deal.
What layouts are there in Cheval Residences?
1-bedroom, 2-bedroom and 3-bedroom, according to the sales-launch announcement. Which sizes are actually free right now depends on what is on the market; I will send the current list.
Where is Cheval Residences?
Dubai Islands. The reclaimed islands off Deira, formerly Deira Islands: beaches, hotels and new residential on the northern coast.
How much does an apartment in Cheval Residences cost?
Our database has no open listings for Cheval Residences at the moment. I will check the price of the layout you want against the closed databases and send it together with the deal costs.
SHIONE is Beyond’s second residential project in the SIORA master plan on Dubai Islands: two towers, 603 residences, AED 3bn in value. One-bedroom units launched from about AED 2.7m on a 50/50 payment plan, with handover expected in 2030.
Eight UAE megaprojects and what each means for property: Al Maktoum airport at 260m passengers, the 900 km Etihad Rail, Palm Jebel Ali with 90 km of coast, the Metro Blue Line, Dubai Islands, the $5.7bn Wynn resort, Saadiyat’s museums and Yas Island.
Nakheel has released Bay Estate, the first community on Island E of Dubai Islands: 357 townhouses and villas plus 60 plots around two swimmable lagoons. A three-bedroom townhouse averages AED 5.9m; handover is estimated for January 2031.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.
A chain of reclaimed islands under a single government master plan. Almost no coastal land with direct beach access is left inside the emirate — and one or two new projects launch here every month. The opportunity and the risk are the same fact.
A developer building on the Dubai Islands. Between handover and the first tenant there is a list of connections and registrations, and every one of them needs someone on the ground.
A developer building on the Dubai Islands. The dirham’s peg to the dollar shapes the currency risk for every foreign buyer — and the transfer mechanics have costs of their own.
A developer building villas on the Dubai Islands. A house bought off-plan on new land combines two kinds of waiting, and they resolve on different timetables.
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.