Skip to content

Sell your apartment in Dubai

Leave your name and phone number — I will get back to you to discuss price and timing.

How I sell apartments →

Alder at ParkFive

Dubai Production City · Deyaar

Project factsheet

Developer Deyaar
Status Under construction
District Dubai Production City
Handover Q4 2027

Layouts and the handover date come from the developer's brochure in our archive. Prices and payment plans from the same source are deliberately not published: they are dated to when the brochure was issued and do not match today's prices. I will send the current ones over WhatsApp.

Developer prices

These are the starting prices as of the date shown, not today's list: off-plan they are revised several times a year, and more often upwards than down.

Developer
Deyaar Development

Figures come from the developer's own materials sent to brokers, dated 16 November 2026. The commentary behind them is written up in the Russian version of this page.

About the building

A residential building in Dubai Production City, currently under construction. Developer — Deyaar.

About the project

Alder at ParkFive is a residential building in Dubai Production City, handover is due Q4 2027.

The developer is Deyaar.

No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.

The final phase of Deyaar's ParkFive community in Dubai Production City, with three golf courses nearby. One-bedrooms from 72 square metres start at $300,000, with the infinity pool set on the fifth floor.

What's for sale

One-bedrooms from 72 sqm — from $300,000, two-bedrooms from 112 sqm. The entry unit works out to roughly $4,200 per square metre — one of the lowest figures among the projects we've reviewed.

Kitchens are fitted, bathroom fixtures are premium, and some layouts include terraces, studies and maid's rooms. The last is rare in compact homes and noticeably widens the pool of family renters.

The final phase: what that changes

Alder closes out ParkFive's development. For a buyer that's more of a plus: the community's infrastructure was already built by earlier phases, so you're moving into a finished environment rather than a construction site.

The second effect is predictability. You can see what the developer's completed buildings in this same community look like, and judge build quality before the deal rather than from renderings.

What's around it

The community has Arabic sikka alleys, art installations and fountains; nearby are shops, restaurants, salons, a mall, schools and clinics. The podium has pools, lounges and co-working spaces.

Selling-side materials for the sales launch: sizes, prices, fit-out and community composition. The price per square metre is our own calculation.

Registered sales in the building

Only 1 sale in Alder at ParkFive have reached the Land Department register so far — too few to quote a median price.

Sales by year — Dubai Land Department register
Year Sales Median price AED/sqft Total value
2025 1 small sample — — AED 1.7m
2026, to 18 November 67 AED 1 686 758 1 378 AED 111.5m

Registered sales of all property types; 2026 is a partial year. Medians, not averages; with fewer than 5 sales no price is quoted. Off-plan share of sales over the last 12 months: 100%.

Rents across the International Media Production Zone community — not this building alone
Type Annual rent Contracts Gross yield
Studios AED 37 800 2 673 9%
1-bedroom AED 56 500 2 627 8.7%
2-bedroom AED 79 000 931 6.9%
3-bedroom AED 90 000 100 —

Median Ejari contract (November 2025 — October 2026) across the whole community rather than this building: rents are not published building by building. Gross yield — before service charges, vacancy and fees.

Latest registered sales
Date Unit Status Size, sq ft Price AED/sqft
17/11/2026 Apartment, 2-bedroom off-plan 1 388 AED 1 683 455 1 213
02/11/2026 Apartment, 2-bedroom off-plan 1 245 AED 1 739 128 1 397
26/10/2026 Apartment, 3-bedroom off-plan 1 754 AED 2 387 256 1 361
26/10/2026 Apartment, 2-bedroom off-plan 1 289 AED 1 768 149 1 371
27/08/2026 Apartment, 1-bedroom off-plan 798 AED 1 217 073 1 525
27/08/2026 Apartment, 3-bedroom off-plan 1 657 AED 2 347 040 1 416
24/06/2026 Apartment, 2-bedroom off-plan 1 472 AED 1 714 081 1 164
23/06/2026 Apartment, 2-bedroom off-plan 1 201 AED 1 609 225 1 340
19/06/2026 Apartment, 3-bedroom off-plan 1 657 AED 2 367 443 1 429
15/06/2026 Apartment, 3-bedroom off-plan 1 751 AED 2 422 067 1 383
09/06/2026 Apartment, 2-bedroom off-plan 1 289 AED 1 703 409 1 322
08/06/2026 Apartment, 2-bedroom off-plan 1 206 AED 1 615 750 1 340
23/04/2026 Apartment, 2-bedroom off-plan 1 289 AED 1 752 577 1 359
20/04/2026 Apartment, 2-bedroom off-plan 1 206 AED 1 744 933 1 447
17/04/2026 Apartment, 2-bedroom off-plan 1 201 AED 1 654 608 1 378
16/04/2026 Apartment, 2-bedroom off-plan 1 256 AED 1 656 378 1 319
13/04/2026 Apartment, 1-bedroom off-plan 798 AED 1 182 388 1 482
10/04/2026 Apartment, 2-bedroom off-plan 1 206 AED 1 645 906 1 365
10/04/2026 Apartment, 2-bedroom off-plan 1 288 AED 1 717 774 1 333
09/04/2026 Apartment, 2-bedroom off-plan 1 206 AED 1 661 034 1 378
03/04/2026 Apartment, 2-bedroom off-plan 1 257 AED 1 719 873 1 368
03/04/2026 Apartment, 1-bedroom off-plan 780 AED 1 089 443 1 396
30/03/2026 Apartment, 2-bedroom off-plan 1 206 AED 1 630 780 1 353
26/03/2026 Apartment, 2-bedroom off-plan 1 206 AED 1 777 306 1 474

Buyer, seller and unit number are not part of the Land Department open data.

Source: Dubai Data (calculated from Dubai Land Department open data), data to 18 November 2026.

Where it is

The pin is placed by district — I send the exact address on request.

Nothing in the stock for this project right now

Listings for Alder at ParkFive do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Dubai Production City.

Ask about this project
Handover payment

A mortgage covers the final instalment

The final payment on this building falls in 2027 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.

  • Up to 80% of the appraised value, no extra down payment
  • 3.99% fixed for three years, up to 25 years in term
  • 6–12 months before the keys — the bank wants six months of income history

Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.

Ask on WhatsApp

Frequently asked about Alder at ParkFive

Who is the developer of Alder at ParkFive?

Deyaar.

When is Alder at ParkFive handed over?

The developer's brochure says Q4 2027. The date in the contract for a particular unit can differ — I check it before the deal.

Where is Alder at ParkFive?

Production City. Dubai Production City, formerly IMPZ: a printing and media zone with lakeside apartment buildings and low prices.

How much does an apartment in Alder at ParkFive cost?

No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.

In the news

What has been written about the building, its developer and Dubai Production City

Where this project stands today

I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram

Who is this lot for?

One question, and the chat opens with the request ready.