Photos and renders of the building and grounds — not of this particular unit.
1 / 6
Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
Developer prices
These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
2 bedrooms — 2 lots
from AED 1 789 072 1578–1740 sqftas of 16 November 2026
Developer
Deyaar Development
Figures come from the developer's own materials sent to brokers, dated 16 November 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
A residential building in Dubai Production City, currently under construction. Developer — Deyaar.
About the project
Alder at ParkFive is a residential building in Dubai Production City, handover is due Q4 2027.
The developer is Deyaar.
No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.
The final phase of Deyaar's ParkFive community in Dubai Production City, with three golf courses nearby. One-bedrooms from 72 square metres start at $300,000, with the infinity pool set on the fifth floor.
What's for sale
One-bedrooms from 72 sqm — from $300,000, two-bedrooms from 112 sqm. The entry unit works out to roughly $4,200 per square metre — one of the lowest figures among the projects we've reviewed.
Kitchens are fitted, bathroom fixtures are premium, and some layouts include terraces, studies and maid's rooms. The last is rare in compact homes and noticeably widens the pool of family renters.
The final phase: what that changes
Alder closes out ParkFive's development. For a buyer that's more of a plus: the community's infrastructure was already built by earlier phases, so you're moving into a finished environment rather than a construction site.
The second effect is predictability. You can see what the developer's completed buildings in this same community look like, and judge build quality before the deal rather than from renderings.
What's around it
The community has Arabic sikka alleys, art installations and fountains; nearby are shops, restaurants, salons, a mall, schools and clinics. The podium has pools, lounges and co-working spaces.
Selling-side materials for the sales launch: sizes, prices, fit-out and community composition. The price per square metre is our own calculation.
Registered sales in the building
Only 1 sale in Alder at ParkFive have reached the Land Department register so far — too few to quote a median price.
Sales by year — Dubai Land Department register
Year
Sales
Median price
AED/sqft
Total value
2025
1 small sample
—
—
AED 1.7m
2026, to 18 November
67
AED 1 686 758
1 378
AED 111.5m
Registered sales of all property types; 2026 is a partial year. Medians, not averages; with fewer than 5 sales no price is quoted. Off-plan share of sales over the last 12 months: 100%.
Rents across the International Media Production Zone community — not this building alone
Type
Annual rent
Contracts
Gross yield
Studios
AED 37 800
2 673
9%
1-bedroom
AED 56 500
2 627
8.7%
2-bedroom
AED 79 000
931
6.9%
3-bedroom
AED 90 000
100
—
Median Ejari contract (November 2025 — October 2026) across the whole community rather than this building: rents are not published building by building. Gross yield — before service charges, vacancy and fees.
Latest registered sales
Date
Unit
Status
Size, sq ft
Price
AED/sqft
17/11/2026
Apartment, 2-bedroom
off-plan
1 388
AED 1 683 455
1 213
02/11/2026
Apartment, 2-bedroom
off-plan
1 245
AED 1 739 128
1 397
26/10/2026
Apartment, 3-bedroom
off-plan
1 754
AED 2 387 256
1 361
26/10/2026
Apartment, 2-bedroom
off-plan
1 289
AED 1 768 149
1 371
27/08/2026
Apartment, 1-bedroom
off-plan
798
AED 1 217 073
1 525
27/08/2026
Apartment, 3-bedroom
off-plan
1 657
AED 2 347 040
1 416
24/06/2026
Apartment, 2-bedroom
off-plan
1 472
AED 1 714 081
1 164
23/06/2026
Apartment, 2-bedroom
off-plan
1 201
AED 1 609 225
1 340
19/06/2026
Apartment, 3-bedroom
off-plan
1 657
AED 2 367 443
1 429
15/06/2026
Apartment, 3-bedroom
off-plan
1 751
AED 2 422 067
1 383
09/06/2026
Apartment, 2-bedroom
off-plan
1 289
AED 1 703 409
1 322
08/06/2026
Apartment, 2-bedroom
off-plan
1 206
AED 1 615 750
1 340
23/04/2026
Apartment, 2-bedroom
off-plan
1 289
AED 1 752 577
1 359
20/04/2026
Apartment, 2-bedroom
off-plan
1 206
AED 1 744 933
1 447
17/04/2026
Apartment, 2-bedroom
off-plan
1 201
AED 1 654 608
1 378
16/04/2026
Apartment, 2-bedroom
off-plan
1 256
AED 1 656 378
1 319
13/04/2026
Apartment, 1-bedroom
off-plan
798
AED 1 182 388
1 482
10/04/2026
Apartment, 2-bedroom
off-plan
1 206
AED 1 645 906
1 365
10/04/2026
Apartment, 2-bedroom
off-plan
1 288
AED 1 717 774
1 333
09/04/2026
Apartment, 2-bedroom
off-plan
1 206
AED 1 661 034
1 378
03/04/2026
Apartment, 2-bedroom
off-plan
1 257
AED 1 719 873
1 368
03/04/2026
Apartment, 1-bedroom
off-plan
780
AED 1 089 443
1 396
30/03/2026
Apartment, 2-bedroom
off-plan
1 206
AED 1 630 780
1 353
26/03/2026
Apartment, 2-bedroom
off-plan
1 206
AED 1 777 306
1 474
Buyer, seller and unit number are not part of the Land Department open data.
Source: Dubai Data (calculated from Dubai Land Department open data), data to 18 November 2026.
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
Listings for Alder at ParkFive do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Dubai Production City.
The final payment on this building falls in 2027 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The developer's brochure says Q4 2027. The date in the contract for a particular unit can differ — I check it before the deal.
Where is Alder at ParkFive?
Production City. Dubai Production City, formerly IMPZ: a printing and media zone with lakeside apartment buildings and low prices.
How much does an apartment in Alder at ParkFive cost?
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
The RTA and Dubai Holding signed an AED 6bn (about $1.6bn) road programme: four new JVC access points with interchanges, double the capacity and 70% shorter journeys. Hessa Street phase two adds a 780 m bridge and a 480 m tunnel out of JVC. What it means for owners and buyers.
Deyaar is building DWTN (Downtown) Residences in Business Bay: twin 445 m, 111-storey towers with 522 homes — 432 apartments, 76 duplexes, 13 penthouses and a “Royal Palace”. From AED 1.86m with half due at keys. Construction began in January 2026; completion is quoted for 2029–2030.
A public company with a long delivery record and an in-house property management arm. Why the second part changes the ownership experience, and what to check in the buildings it runs.