Vida Residences +117%: what the Dubai Marina project statistics actually show
The largest developer’s return to Dubai Marina prompted a look at its earlier projects there. The valuable number in that statistic is not the growth percentage.
Dubai Marina
Photos and renders of the community and grounds — not of this particular unit.
Layouts and the handover date come from the developer's brochure in our archive. Prices and payment plans from the same source are deliberately not published: they are dated to when the brochure was issued and do not match today's prices. I will send the current ones over WhatsApp.
W Residences 3 is a residential community in Dubai Marina, handover is due Q4 2028.
Layouts, according to the developer's brochure — studios and 1 bedroom.
No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.
The third phase of W Residences in Dubai Harbour: studios and one-bedrooms, with handover in Q4 2028 per the brochure.
W Residences 3 is a Dubai Harbour project — by its name, the phase after W Residences 2. It has no propsearch passport: the developer, storey count and number of apartments aren’t in our data.
The developer’s brochure lists studios and one-bedroom apartments, handover Q4 2028. We don’t quote the brochure prices — they’ve been out of date since it was released. There are no units from the project in our stock right now.
According to its brochure, the second phase hands over a year earlier, in Q4 2027, and is studios only. The third adds one-bedrooms — for buyers who need more than a studio.
In the same quarter our directory also has Dubai Harbour Residences by Shamal Holding, Sobha Seahaven and Damac Bay by Cavalli — useful comparisons once a concrete offer appears.
The benchmark next door in Dubai Marina: 239 units, median AED 3.75 million, AED 2,447/ft². Rental demand there rests on the walkable promenade, the metro and the tram.
No propsearch passport for the project (the record resolves to Dubai Harbour). Developer brochure in our archive: studios and one-bedrooms, handover Q4 2028; for the second phase — studios, Q4 2027. Our stock as of 21 September 2026: no units in the project; Dubai Marina — 239 units, median and price per square foot.
The pin is placed by district — I send the exact address on request.
Listings for W Residences 3 do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Dubai Marina.
Ask about this projectThe final payment on this building falls in 2028 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.
Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.
Ask on WhatsAppThe developer's brochure says Q4 2028. The date in the contract for a particular unit can differ — I check it before the deal.
Studios and 1-bedroom, according to the developer's brochure. Which sizes are actually free right now depends on what is on the market; I will send the current list.
Dubai Marina. The original high-rise waterfront: a dense forest of towers around a man-made marina, and still the busiest rental market in the city.
There are no open listings for this building in the database right now. I will check the price for a particular layout against the closed databases and send it with the deal costs worked out.
What has been written about the building, its developer and Dubai Marina
The largest developer’s return to Dubai Marina prompted a look at its earlier projects there. The valuable number in that statistic is not the growth percentage.
A district designed from nothing on a Vancouver waterfront model, built between 2003 and 2008. The numbers behind it, and what a fully man-made location tells you about how value is created in Dubai.
A developer with buildings on both sides of Sheikh Zayed Road. The two districts look interchangeable on a map and behave differently — here is what the price gap actually buys.
A Dubai Marina tower from 2011. In buildings owned mostly by absent investors, decisions stop being made — and the symptoms are visible in an afternoon if you know them.
A Dubai Marina tower completed in 2023. Much of the stock in a newly delivered building is sold on by off-plan investors — and buying from one is its own transaction.
A Dubai Marina tower completed a few years ago. Buildings at this age go through a predictable event that shapes their prices — and it is a buying opportunity if you can see it.
A tall branded tower under construction in Dubai Marina. Infill development in a built-out district has a particular economics — for the buyer and for the neighbours.
The property arm of a large regional engineering and contracting group, with towers in the Marina and on the Palm. What an engineering parent means in a delivered building.
A smaller developer with a mid-2000s Dubai Marina building. Most towers are not landmarks, and valuing an ordinary one is a different exercise — here is how it works.
Message me for the free layouts in W Residences 3, the real entry price and what owners and tenants say — not the brochure copy.
Telegram is the fastest way — I answer personally.
Message on Telegram