These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
1 bedroom
from AED 2 900 000 as of 20 August 2026
2 bedrooms
from AED 5 000 000 as of 20 August 2026
Developer
Ellington Properties
Figures come from the developer's own materials sent to brokers, dated 20 August 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
Located in Uptown Dubai. Developer — Ellington Properties Development. Architect — Brewer Smith Brewer Group.
What the building has
Swimming pool
Parking
Shops
Sports courts
Specifications for Mercer House per Propsearch and the Dubai Land Department.
They describe the whole building, not the individual unit.
About the project
Mercer House is a residential complex of several buildings in Uptown Dubai, currently under construction.
The developer is Ellington Properties Development. The architecture is by Brewer Smith Brewer Group.
The tallest tower rises 45 storeys.
There is not a single lot in this project in the database right now — it is refreshed every night, and listings here appear and go.
An Ellington complex in Uptown Dubai of two towers, 34 and 41 storeys, under construction: we have a 2,590 ft² three-bedroom at AED 5.59 million — just above the developer's entry price for a two-bedroom.
What it is
Mercer House is a multi-building residential complex by Ellington Properties Development in Uptown Dubai. It has two towers — a 34-storey North Tower and a 41-storey South Tower; the architect is Brewer Smith Brewer Group. The number of apartments isn't listed in the passport.
The property description lists a pool, parking, retail and sports facilities — for the complex as a whole.
Developer entry vs resale
Ellington's summary to brokers of 20 August 2026 puts one-bedrooms from AED 2.9 million and two-bedrooms from AED 5 million. That's the entry point across the developer's line-up, not a price list for this block.
Our stock as of 21 September 2026 has one unit — a 2,590 ft² three-bedroom at AED 5.59 million, 5% below market. For roughly the developer's two-bedroom entry price, you get a larger flat.
The final payment falls in 2027, so an assignment buyer needs to know exactly how much has been paid and what's left to pay on handover.
Launch and construction
Mercer House launched in December 2023 with studios, one- to three-bedroom apartments and four-bedroom penthouses, and handover set for Q3 2027. In spring 2024 two-bedrooms were offered from about USD 871,000.
The complex is two towers: a 34-storey North Tower and a 41-storey South Tower. In October 2025 Ellington signed a main construction contract worth more than AED 1 billion (about USD 272 million) with China Railway 18th Bureau Group. The project won an International Property Award for best mixed-use development, and includes a clubhouse, sports courts and an urban beach club.
Propsearch passport: 45 storeys in the tallest block, developer Ellington Properties Development, architect Brewer Smith Brewer Group, status "under development", amenities. Ellington summary of 20 August 2026: starting prices. Our stock as of 21 September 2026: 1 unit (size, price, discount). Launch and two-bedroom price — announcements of December 2023 and March 2024; towers, main contract and award — Ellington press release, October 2025.
What the complex has
Swimming pool
Parking
Shops
Sports courts
Where it is
Nothing in the stock for this project right now
The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Uptown Dubai.
Ellington Properties Development. The architecture is by Brewer Smith Brewer Group.
How many floors does Mercer House have?
45 — that is the tallest building of the complex.
When is Mercer House handed over?
Mercer House is still being built. The handover date of a given unit I verify against its contract before the deal.
How much does an apartment in Mercer House cost?
There are no open listings for this building in the database right now. I will check the price for a particular layout against the closed databases and send it with the deal costs worked out.
What is on site at Mercer House?
Swimming pool, Parking, Shops, Sports courts. The list comes from the project description and covers the whole complex.
DMCC is adding two office towers to Uptown Dubai — 21 and 15 storeys, more than 560 000 sq ft of Grade A space and 82 000 sq ft of retail. Leasing opens in the second half of 2026 and completion is due in Q1 2028, taking the district past 1m sq ft. What it means for nearby owners.
Where this project stands today
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.