Photos and renders of the building and grounds — not of this particular unit.
1 / 9
About the building
9-storey residential building in Dubai Islands. Developer — Avenew Real Estate Development. Architect — Global Engineering Consultants.
What the building has
Swimming pool
Gym
Children's area
Shops
Barbecue area
Specifications for Lia Residences per Propsearch and the Dubai Land Department.
They describe the whole building, not the individual unit.
About the project
Lia Residences is a 9-storey residential building in Dubai Islands, currently under construction.
The developer is Avenew Real Estate Development. The architecture is by Global Engineering Consultants.
The building holds 82 apartments in total.
No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.
Lia Residences is a nine-storey boutique building of 82 apartments by Avenew on Dubai Islands, under construction, with a pool, gym and barbecue area listed.
What it is
Lia Residences is a mid-rise residential building on Dubai Islands: 9 storeys, 82 apartments. Developer: Avenew Real Estate Development; architect: Global Engineering Consultants. Status: under construction.
The description lists a pool, gym, kids' area, shops and a barbecue area.
Handover isn't in the passport, and there are no lots in our database right now.
A small building on a growing island
82 apartments is an intimate format: fewer neighbours and less competition for tenants within the building, but the service charge is split among fewer owners.
Dubai Islands is an early entry: our stock has 77 lots in the district, and of 57 with a known status only 2 are ready. Median AED 5.5 million, entry from AED 1.5 million, AED 2,248/ft².
The islands have already changed concept, so check what will actually exist around the building by handover rather than relying on the master plan.
Propsearch passport: 9 storeys, 82 apartments, developer Avenew Real Estate Development, architect Global Engineering Consultants, status “under construction”, amenities. Our stock as of 21 September 2026: no lots in the project; Dubai Islands statistics.
What the complex has
Swimming pool
Gym
Children's area
Shops
Barbecue area
Where it is
Nothing in the stock for this project right now
Listings for Lia Residences do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Dubai Islands.
Avenew Real Estate Development. The architecture is by Global Engineering Consultants.
How many floors does Lia Residences have?
9. The building has 82 apartments.
When is Lia Residences handed over?
The project is under construction. I check the exact date for a particular unit in the contract before the deal.
Where is Lia Residences?
Dubai Islands. The reclaimed islands off Deira, formerly Deira Islands: beaches, hotels and new residential on the northern coast.
How much does an apartment in Lia Residences cost?
Our database has no open listings for Lia Residences at the moment. I will check the price of the layout you want against the closed databases and send it together with the deal costs.
What is on site at Lia Residences?
Swimming pool, Gym, Children's area, Shops, Barbecue area. The list comes from the project description and covers the whole complex.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.
A chain of reclaimed islands under a single government master plan. Almost no coastal land with direct beach access is left inside the emirate — and one or two new projects launch here every month. The opportunity and the risk are the same fact.
A developer building on the Dubai Islands. Between handover and the first tenant there is a list of connections and registrations, and every one of them needs someone on the ground.
A developer building on the Dubai Islands. The dirham’s peg to the dollar shapes the currency risk for every foreign buyer — and the transfer mechanics have costs of their own.
A developer building villas on the Dubai Islands. A house bought off-plan on new land combines two kinds of waiting, and they resolve on different timetables.
A developer with two projects on the Dubai Islands. Beach access is sold as a feature and defined as a legal arrangement — and the two are not always the same thing.
A mid-market company that went from a handful of projects to a large pipeline in a few years. What rapid growth does to risk, and the specific evidence that separates a good scaler from a stretched one.
The state developer behind Palm Jumeirah and the Dubai Islands. The difference between a master developer and a building developer, and why it matters for what you own.
Where this project stands today
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.