Metac Properties: what “beachfront” means on a reclaimed island
A developer with two projects on the Dubai Islands. Beach access is sold as a feature and defined as a legal arrangement — and the two are not always the same thing.
Dubai Islands · Metac Properties
The developer's last quote in our materials is dated 6 October 2025, which is more than 6 months old, so the sums are not shown here. I will send the current price list and availability over WhatsApp.
Figures come from the developer's own materials sent to brokers, dated 6 October 2025. The commentary behind them is written up in the Russian version of this page.
13-storey residential building in Dubai Islands, completed in 2026. Developer — Metac Properties. Architect — Face Architecture & Design.
Specifications for Haven Living per Propsearch and the Dubai Land Department. They describe the whole building, not the individual unit.
Haven Living is a 13-storey residential building in Dubai Islands, completed in 2026.
The developer is Metac Properties. The architecture is by Face Architecture & Design.
No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.
A 13-storey Metac Properties building on Dubai Islands, completed in 2026 — one of the district's few finished homes, with generously sized one-bedrooms.
Haven Living is a 13-storey residential building on Dubai Islands. Developer: Metac Properties; design by Face Architecture & Design. Completed in 2026. The unit count isn't in the passport.
The unit-by-unit inventory of 6 October 2025 showed five units free in the whole building. One-bedrooms here are large — from 1,219 ft² — and the single two-bedroom with a study measures 3,257 ft², a format other buildings would call a penthouse.
That quote is more than six months old, so we don't show prices.
Dubai Islands in our stock: 77 lots, and of the 57 with a known status only two are ready. District median AED 5.5 million, AED 2,248/ft².
Against that, a completed building is scarce: you can view it in person and let it immediately rather than wait for the district to fill in. The flip side is several more years of construction around it.
The district has changed its concept twice, and the current master plan isn't set in stone either. Buying ready here gets you an early entry, but you'll be living in or letting out a district that is still taking shape.
In autumn 2023, before the official launch, Haven Living was presented as the first residential project of a company that had worked as main contractor for Nakheel and Emaar. One- to four-bedroom apartments and a duplex were announced, on a flexible payment plan.
Handover was then promised for Q4 2025; according to the passport the building was completed in 2026, a modest slip.
Propsearch passport: 13 storeys, developer Metac Properties, design by Face Architecture & Design, completed 2026. Inventory of 6 October 2025: 5 free units, sizes. Our stock as of 21 September 2026: no lots in this project; Dubai Islands — 77 lots, median and price per square foot. Developer background, unit mix and promised date — project announcement, October 2023.
The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Dubai Islands.
Ask about this projectMetac Properties. The architecture is by Face Architecture & Design.
13.
Yes, the building was handed over in 2026. This is ready housing: you can move in or let it out right after the deal.
Dubai Islands. The reclaimed islands off Deira, formerly Deira Islands: beaches, hotels and new residential on the northern coast.
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
What has been written about the building, its developer and Dubai Islands
A developer with two projects on the Dubai Islands. Beach access is sold as a feature and defined as a legal arrangement — and the two are not always the same thing.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.
A chain of reclaimed islands under a single government master plan. Almost no coastal land with direct beach access is left inside the emirate — and one or two new projects launch here every month. The opportunity and the risk are the same fact.
A developer building on the Dubai Islands. Between handover and the first tenant there is a list of connections and registrations, and every one of them needs someone on the ground.
A developer building on the Dubai Islands. The dirham’s peg to the dollar shapes the currency risk for every foreign buyer — and the transfer mechanics have costs of their own.
A developer building villas on the Dubai Islands. A house bought off-plan on new land combines two kinds of waiting, and they resolve on different timetables.
A mid-market company that went from a handful of projects to a large pipeline in a few years. What rapid growth does to risk, and the specific evidence that separates a good scaler from a stretched one.
The state developer behind Palm Jumeirah and the Dubai Islands. The difference between a master developer and a building developer, and why it matters for what you own.
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.
Telegram is the fastest way — I answer personally.
Message on Telegram