Skip to content

Collective Tower 1

Dubai Hills Estate

Project factsheet

Storeys 13
Status Completed
District Dubai Hills Estate

About the building

13-storey residential building in Dubai Hills Estate.

Specifications for Collective Tower 1 per Propsearch and the Dubai Land Department. They describe the whole building, not the individual unit.

About the project

Collective Tower 1 is a 13-storey residential building in Dubai Hills Estate.

The database currently holds 3 lots in this project, from 1 550 000 AED.

Collective's first tower in Dubai Hills Estate — 13 storeys, handed over. A format of compact furnished apartments with an extensive set of common spaces.

What kind of building this is

Collective Tower 1 is a 13-storey residential building in Dubai Hills Estate, listed as complete in the passport. The project was built around a logic that didn't appear on the Dubai market right away: a compact apartment plus large common spaces, instead of a spacious apartment and an empty lobby.

Our own shoot shows exactly that: a terrace along the facade, a co-working lounge, a pool — and, as a separate block, the furnished apartments. Shots with views of Dubai Hills were deliberately left out of the set: on this building's page they'd show the area, not the building itself.

Dubai Hills Estate is a large community between Downtown and the Marina side of the city, with a golf course, a park and a mall. It's a midpoint transport-wise: roughly equidistant from both business hubs.

Who this format suits

A compact furnished apartment with a co-working space and lounge downstairs is a proposition for a tenant who works remotely or travels often. They're paying for an environment, not square metres, and so they negotiate less over size.

For an investor that means a higher rate per square foot than in an ordinary building in the same area, and faster leasing. That can be checked against actual leases in the building itself: it's handed over, and the data exists.

The flip side: the common areas are funded by the owners. In a building where half the value sits in the co-working space and terrace, the service-charge share per square foot is higher than in a neighbouring building without them. Work out the net yield, not the gross figure.

What to check

First — exactly what's included in the furnishing and what condition it's in: in compact units, the furniture is part of the product, not a bonus.

Second — how full the common areas actually are. An empty co-working space in a handed-over building is a sign the idea hasn't worked at this specific address, and the rental premium for it won't pay off.

Third — the surrounding mix in Dubai Hills. The community is still being built out, and new buildings compete for the same tenant. Check how much similar supply is coming up nearby.

The property passport from propsearch (storeys, area, stage) and our own professional shoot of the handed-over tower: common areas, pool, co-working lounge and furnished apartments.

Where it is

Frequently asked about Collective Tower 1

How many floors does Collective Tower 1 have?

13.

Where is Collective Tower 1?

Dubai Hills Estate. Emaar’s flagship family masterplan: a golf course, a park, a mall and schools, eleven minutes from Downtown.

How much does an apartment in Collective Tower 1 cost?

The database currently holds 3 lots in this project, from 1 550 000 AED. The list changes daily — I will send a fresh selection for the building on request.

In the news

What has been written about the building, its developer and Dubai Hills Estate

Where this project stands today

Message me for the free layouts in Collective Tower 1, the real entry price and what owners and tenants say — not the brochure copy.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram