Photos and renders of the building and grounds — not of this particular unit.
1 / 6
Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
About the building
A residential building in Dubai Islands, currently under construction.
Specifications for Coastal Haven per Propsearch and the Dubai Land Department.
They describe the whole building, not the individual unit.
About the project
Coastal Haven is a residential building in Dubai Islands, handover is due Q1 2028.
The database has nothing for this project at the moment: lots come and go here, and it refreshes nightly.
A 15-storey Prestige One building on the Dubai Islands, three minutes from the island's mall. Sea-view balconies on every apartment, with jacuzzi terraces on the penthouses.
What's on offer
Apartments and penthouses. Every unit has a sea-view balcony, and the top units have spacious terraces with jacuzzis.
Fifteen storeys is a mid-range height for the island. Compared with the towers, that means less strain on the lifts and typically a lower service charge.
What's in the building
The podium has an infinity pool with a lounge area, a cinema, and tennis and badminton courts. The promenade and a Blue Flag beach are nearby.
The courts are worth checking on the floor plan: in compact projects they're sometimes placed so the noise carries straight into the windows of the lower floors.
The island
Dubai Islands is being developed as a resort district: beaches, promenades, hotels, shopping. It's three minutes to the island's mall.
The area is being developed in phases, so the view and water access from a specific building are worth checking against the development plan for neighbouring plots.
Seller's materials at sales launch: storey count, complex composition and surroundings.
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
Listings for Coastal Haven do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Dubai Islands.
The final payment on this building falls in 2028 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The developer's brochure says Q1 2028. The date in the contract for a particular unit can differ — I check it before the deal.
Where is Coastal Haven?
Dubai Islands. The reclaimed islands off Deira, formerly Deira Islands: beaches, hotels and new residential on the northern coast.
How much does an apartment in Coastal Haven cost?
There are no open listings for this building in the database right now. I will check the price for a particular layout against the closed databases and send it with the deal costs worked out.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.
A chain of reclaimed islands under a single government master plan. Almost no coastal land with direct beach access is left inside the emirate — and one or two new projects launch here every month. The opportunity and the risk are the same fact.
A developer building on the Dubai Islands. Between handover and the first tenant there is a list of connections and registrations, and every one of them needs someone on the ground.
A developer building on the Dubai Islands. The dirham’s peg to the dollar shapes the currency risk for every foreign buyer — and the transfer mechanics have costs of their own.
A developer building villas on the Dubai Islands. A house bought off-plan on new land combines two kinds of waiting, and they resolve on different timetables.
A developer with two projects on the Dubai Islands. Beach access is sold as a feature and defined as a legal arrangement — and the two are not always the same thing.
A mid-market company that went from a handful of projects to a large pipeline in a few years. What rapid growth does to risk, and the specific evidence that separates a good scaler from a stretched one.
The state developer behind Palm Jumeirah and the Dubai Islands. The difference between a master developer and a building developer, and why it matters for what you own.
Where this project stands today
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.