Skip to content

O1NE District DAWN

Motor City · Avenew Development

Project factsheet

Developer Avenew Development
Status Planned
District Motor City
Handover Q1 2030

Layouts and the handover date come from the sales-launch announcement; the date of that announcement is shown next to the prices. It is what the developer claimed at launch, not a registry record — off-plan, phasing and dates get revised. I will send the current ones over WhatsApp.

Developer prices

These are the starting prices as of the date shown, not today's list: off-plan they are revised several times a year, and more often upwards than down.

Payment plan
10/40/50
Handover
Q1 2030
Developer
Avenew Development совместно с Kora Properties

Figures come from the developer's own materials sent to brokers, dated 29 July 2026. The commentary behind them is written up in the Russian version of this page.

Floor plans

Floor plans from the developer's own materials. The areas and the unit split on them were correct when the drawing was issued — check them against the plan attached to the contract before the deal.

About the building

A office building in Motor City. Developer — Avenew Development.

Specifications for O1NE District DAWN as published by the developer — the project is under construction, so there is no Land Department record yet. They describe the whole building, not the individual unit.

About the project

O1NE District DAWN is an office building in Motor City, handover is due Q1 2030.

The developer is Avenew Development.

The database has nothing for this project at the moment: lots come and go here, and it refreshes nightly.

An office cluster in Motor City: a 1.85 million-square-foot master plan with four Class A commercial towers and two medical towers, plus a retail gallery under a shared podium. Launch pricing from AED 5 million, handover in Q1 2030.

What's being built

DAWN is the first tower in the O1NE District cluster. The master plan comprises six buildings in total: four Class A commercial towers and two for clinics, joined by a podium with an integrated shopping centre. The master plan's total area is 1.85 million ft².

Offices occupy floors three through sixteen, with unit sizes from 1,963 to 5,479 ft², in shell-and-core format. The lobby is 7.2 metres high, with two entrances: one straight from the street into the office section, and one through a shared vestibule into the retail gallery. The first tower has a stated seven lifts for 70 office units.

The stated range of shared spaces is unusual for an office project: hanging and podium gardens, rooftop restaurants overlooking the racetrack, open-air coworking areas, and an air-conditioned link into the shopping centre. Interiors are handled by two studios, CRD Design and Kinsler Interiors.

Who's building it, and where it is

The project is run by Avenew Development together with Kora Properties. Kora is part of the APPCORP holding, known for retail brand franchises across the region. For an office project, that partnership is more asset than liability: the partner has experience managing the retail component, which takes up a substantial share of the podium here.

The location is Motor City, next to the Dubai Autodrome, with access towards Downtown, Palm Jumeirah and the future Al Maktoum airport. It's not the business district, but a growing urban sub-centre — and that's exactly what the project's pricing argument is built on.

The entry economics — and what to check in them

Launch pricing: from AED 2,500 per square foot, entry into the project from AED 5 million. The payment plan is 10/40/50 — 10% at booking plus a 4% Land Department fee and a fixed registration fee, 40% in seven instalments during construction, 50% on handover.

The seller's argument is built on a comparison: the combination of Class A offices with a shopping centre under one roof exists in only a handful of places on mainland Dubai, and the price per square foot there already runs into the thousands of dirhams on top. Entry at AED 2,500–2,800 looks roughly half that benchmark.

The yield calculation quoted for a specific unit worked out to around 14% net, at a rental rate of AED 350 per square foot and a service charge of around 20. What matters here isn't the result but the input assumption: a rate of AED 350 for Motor City is an upper estimate — the same materials put neighbouring buildings in the district at AED 280–300. It's more sensible to calculate off the lower end.

The master plan, unit layout, format and design partners — developer materials for the sales launch, 15 July 2026. The developer, location, launch price and payment plan — developer materials, 29 July 2026. The per-unit yield calculation and the comparison with district rental rates — the seller's own calculation, 1 August 2026.

Where it is

The pin is placed by district — I send the exact address on request.

Nothing in the stock for this project right now

Lots for this project come and go, and the stock is topped up nightly. Message me — I will look through the closed bases and find the closest alternatives in Motor City.

Ask about this project
Handover payment

A mortgage covers the final instalment

The final payment on this building falls in 2030 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.

  • Up to 80% of the appraised value, no extra down payment
  • 3.99% fixed for three years, up to 25 years in term
  • 6–12 months before the keys — the bank wants six months of income history

Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.

Ask on WhatsApp

Frequently asked about O1NE District DAWN

Who is the developer of O1NE District DAWN?

Avenew Development.

When is O1NE District DAWN handed over?

The sales-launch announcement says Q1 2030. The date in the contract for a particular unit can differ — I check it before the deal.

Where is O1NE District DAWN?

Motor City. Built around the Autodrome: low-rise, green, and one of the most liveable of the affordable inland districts.

How much does an office in O1NE District DAWN cost?

There are no open listings for this building in the database right now. I will check the price for a particular layout against the closed databases and send it with the deal costs worked out.

In the news

What has been written about the building, its developer and Motor City

Where this project stands today

I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram