City Walk Crestlane 2
City Walk Phase 3 · Meraas Holding
Project factsheet
About the building
Located in City Walk Phase 3. Developer — Meraas Holding.
Specifications for City Walk Crestlane 2 per Propsearch and the Dubai Land Department. They describe the whole building, not the individual unit.
About the project
City Walk Crestlane 2 is a residential complex of several buildings in City Walk Phase 3, currently under construction.
The developer is Meraas Holding.
The complex holds 201 apartments in total. The tallest tower rises 13 storeys.
The database currently holds 3 lots in this project, from 3 100 000 AED.
A 13-storey building by Meraas in City Walk's third phase, with 201 residences, under construction. The district runs at about AED 3,194/ft² across 59 lots in stock.
What this is
City Walk Crestlane 2 is a residential building in City Walk Phase 3 by Meraas Holding. 13 storeys, 201 residences, stage: construction. Amenities aren't listed in the passport — in Meraas projects they typically apply to the district as a whole rather than a single building.
Meraas is the developer of City Walk itself, and that matters: the district is designed and built by a single company as one cohesive urban environment, not a patchwork of separate plots. The risk that promised infrastructure never gets finished is lower here than usual.
City Walk as a format
City Walk is a rare example in Dubai of a district designed around a street rather than a mall or a tower. Low-rise buildings, pedestrian boulevards, ground-floor retail, cafes with terraces. It's closer to a European urban quarter than to a typical Dubai community.
In our database City Walk has 59 lots, a median of AED 4.48 million, at about AED 3,194/ft². That's more expensive than Dubai Marina and Dubai Hills but cheaper than Business Bay — here you're paying specifically for the environment.
Fifty-nine listings is a mid-depth market: enough to compare and sell, but this isn't Marina with its 214 lots.
Third phase — what it means
Phase 3 means the district's earlier phases are already built and operating. For a buyer that's a rare combination: you move into a new building but into a finished environment — the streets, shops and restaurants nearby already exist rather than being promised.
The flip side is construction on the third phase itself, close by. Check what's being built on neighbouring plots and on what timeline: several years next to a construction site, in a district that sells itself on a walkable environment, changes daily life noticeably.
propsearch building passport (storeys, number of residences, developer, stage) and our own stock as of 27 August 2026 (median and price per square foot for City Walk).
Where it is
Frequently asked about City Walk Crestlane 2
Who is the developer of City Walk Crestlane 2?
Meraas Holding.
How many floors does City Walk Crestlane 2 have?
13 — that is the tallest building of the complex. The complex has 201 apartments.
When is City Walk Crestlane 2 handed over?
City Walk Crestlane 2 is still being built. The handover date of a given unit I verify against its contract before the deal.
Where is City Walk Crestlane 2?
City Walk. Meraas’s low-rise urban district off Al Wasl Road: shopfronts at street level, apartments above, and pavements people actually use.
How much does an apartment in City Walk Crestlane 2 cost?
The database currently holds 3 lots in this project, from 3 100 000 AED. The list changes daily — I will send a fresh selection for the building on request.
Where this project stands today
I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.
Ask a question
Telegram is the fastest way — I answer personally.
Message on Telegram