Jebel Ali Racecourse masterplan: BIG's 5 sq km district and where it stands in 2026
A.R.M. Holding and Bjarke Ingels Group are turning the Jebel Ali Racecourse into a 5 sq km district: eight neighbourhoods around a central park of about 1.5 sq km, with equestrian venues kept. Work was due to start in 2026; no price list yet. How it compares with Dubai Hills.
The Jebel Ali Racecourse is one of the last large open sites inside built-up Dubai. In May 2025 the investment firm A.R.M. Holding announced that it would redevelop it with Bjarke Ingels Group (BIG) into a new district covering five square kilometres. The architects describe the concept as "an archipelago of urban islands in a sea of green".
What the plan contains
A green spine links eight neighbourhoods whose density rises towards a central park of roughly 1.5 sq km. The equestrian heritage of the site is kept, with riding venues in the plan. Around them sit housing, schools, hotels, cultural buildings and mixed-use blocks laid out so that daily errands can be done on foot. The project is framed within the Dubai 2040 Urban Master Plan.
Construction was scheduled to begin in 2026 in phases covering housing, education, hospitality and public infrastructure. As of September 2026 there is no official sales launch or price list. Anything marketed today as "pre-registration" is a queue, not a purchase backed by a registered escrow account.
Talk to a licensed broker: 📲 +971 50 120 32 64 on WhatsApp, @dubai_oleg on Telegram
How big is 5 sq km?
| District | Approx. area, sq km |
|---|---|
| Dubai Hills Estate | 11 |
| Jumeirah Village Circle | 8.7 |
| Dubai Creek Harbour | 7.4 |
| Jebel Ali Racecourse | 5 |
| Business Bay | 4.3 |
| Tilal Al Ghaf | 3 |
So it is about half the size of Dubai Hills but larger than Business Bay. With a large share of the land given to the park and public space, the number of homes will be smaller than the footprint suggests.
The case for buying early — and its conditions
In large Dubai master plans the first releases are usually priced to get sales moving, and prices rise as roads, schools and parks appear. That pattern held in Dubai Hills and Arabian Ranches. But it comes with conditions worth checking before committing:
- Who builds the homes. A.R.M. Holding is an investment company rather than a developer with a long delivery record in Dubai. Find out which developer is responsible for your specific building.
- Sequencing. Phase one is cheapest but lives on a building site longest. If the park and schools come in later phases, early rents will reflect that.
- Access. The site neighbours Jebel Ali and Sheikh Mohammed Bin Zayed Road; where the nearest metro stations end up will matter more than any render. We looked at how stations move prices in our piece on the metro and apartment prices.
- Paperwork. Buy only once the project is registered with the Dubai Land Department and an escrow account is open.
Until then, the sensible approach is to watch for the first-phase announcement, compare its price per square foot with the surrounding resale market, and judge how quickly the amenities near your chosen building will actually be delivered.
What already exists next door, and what homes cost there today, is on the Jebel Ali area page.
In the news
Other write-ups on the site about the same thing.
Palm Jebel Ali: buying into a relaunched project — what to check
The second palm island, reclaimed long ago and revived after a long pause. Relaunched projects come with their own set of questions.
UAE warehouses in 2026: a Grade A shortage, rising rents and who owns the market
Grade A warehouses in Dubai are close to full: JLL put occupancy in Jafza and Dubai Investments Park at 97–100% at the end of 2025, and industrial rents rose 6.8% year on year in Q2 2026 (5% in Abu Dhabi). Leases now run 7–9 years, not 3–5. Who owns the stock and what to check.
Dubai homes over $10 million: 500 sales in 2025 and a record 296 in the first half of 2026
Knight Frank counted 500 Dubai home sales above US$10m in 2025, worth US$9.05bn, against 30 in 2020. The first half of 2026 added 296 more worth US$5.1bn, a half-year record. Where the money went and why the top of the market held up.
Nakheel and Meydan inside Dubai Holding: what the 2024 merger changed for property buyers
In March 2024 Nakheel and Meydan were folded into Dubai Holding and their boards dissolved. By 2026 Palm Jebel Ali has 544 villas on Fronds A–F and 728 on K–P in finishing works, and 892 homes at Jebel Ali Village are being handed over. What changed for buyers, and what did not.
Master-planned vs piecemeal development in Dubai: how it shapes district prices
A district built by one master developer and a district built by dozens of unrelated companies carry very different price predictability. We break down how to tell them apart from a project brochure, and the trade-off between the two.
Al Mamzar floating bridge and Jebel Ali Beach: what Dubai has actually built on its coastline by 2026
Khor Al Mamzar Beach reopened in May 2026 after a AED 500m upgrade: the region's first floating pedestrian bridge, a 3.6km swimming line, a 300-metre night beach and 5.5km of trails. The Al Mamzar corniche is still finishing, while the 6.6km Jebel Ali Beach is being delivered in phases.
Below market in Jebel Ali right now
From the daily off-market feed. Availability and price are confirmed on request.
All below-market listings →






