Photos and renders of the building and grounds — not of this particular unit.
1 / 13
Floor plans
Floor plans from the developer's own materials. The areas and the unit split on them
were correct when the drawing was issued — check them against the plan attached to
the contract before the deal.
About the building
Located in Peninsula, completed in 2024. Developer — Select Group. Architect — Khatib & Alami.
What the building has
Swimming pool
Children's area
Specifications for Peninsula Five per Propsearch and the Dubai Land Department.
They describe the whole building, not the individual unit.
About the project
Peninsula Five is a residential complex of several buildings in Peninsula, completed in 2024.
The developer is Select Group. The architecture is by Khatib & Alami.
The complex holds 381 apartments in total. The tallest tower rises 36 storeys.
The database currently holds 1 lot in this project, from 1 300 000 AED.
Peninsula's fifth phase in Business Bay, operated under the FIVE hospitality brand, on a site the Dubai Water Canal wraps on three sides.
What is stated
Peninsula is a masterplan in Business Bay bordered by the Dubai Water Canal on three sides. According to the developer's materials, the quarter's layout is designed so every building gets a view unblocked by its neighbours.
Peninsula Five is marketed as The Signature Collection under the FIVE hospitality brand — meaning hotel-style management and service rather than a standard residential building.
Distances are given in both kilometres and minutes, as with neighbouring Peninsula Three: Dubai Mall and Burj Khalifa at 2 km.
Masterplan layout, this phase's position within it, and branding — Peninsula Five developer materials; the distance table comes from the same quarter-wide materials.
What the complex has
Swimming pool
Children's area
How it looks today
Our own photographs of the finished development: the gym, the pools, the terraces,
the playground, a kitchen and the views from the balconies. The renders above are
what the developer drew — comparing the promise with the result beats looking at
either one alone.
Photos and renders of the building and grounds — not of this particular unit.
Peninsula Five is handed over and rentable from day one. What that changes about pricing, financing and yield versus an off-plan unit in the same masterplan — and where the catch is.
14 February 2025
Frequently asked about Peninsula Five
Who is the developer of Peninsula Five?
Select Group. The architecture is by Khatib & Alami.
How many floors does Peninsula Five have?
36 — that is the tallest building of the complex. The complex has 381 apartments.
Has Peninsula Five been handed over?
Handed over: 2024. The property is complete, so after the deal you can move in or put it on the rental market at once.
Where is Peninsula Five?
Business Bay. The canal district next to Downtown: conceived as offices, built mostly as apartments, now one of the most tenanted parts of the city.
How much does an apartment in Peninsula Five cost?
The database currently holds 1 lot in this project, from 1 300 000 AED. The list changes daily — I will send a fresh selection for the building on request.
Nakheel awarded AED 3.5bn of contracts for 544 Palm Jebel Ali villas due in Q4 2028; Dubai Retail is building The Yard, the island's first retail hub with 26 concepts, for 2027; and Select Group became the first private developer on the island. How a stalled project is turning into a district.
A developer built around Dubai Marina and the harbour districts. Why the water is the whole thesis, what a waterfront service charge looks like, and where the resale market for these units sits.
Select Group has opened private sales for a 36-storey tower in the d3 design quarter, with views of Downtown, Burj Khalifa, the canal and Sheikh Zayed Road. Prices from AED 2.3m for a one-bedroom, 50/50 payment plan.
In Jumeirah 2, H&H is building Peninsula Dubai: a waterfront district with a marina, a 195-key Rosewood hotel, 63 Rosewood residences and five villas by Hopkins Architects, and residential buildings by RSHP. Rosewood opens in 2029; the RSHP residences target early 2029.
Where this project stands today
I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.