The developer's last quote in our materials is dated 6 October 2025,
which is more than 6 months old, so the sums are not shown
here. I will send the current price list and availability over WhatsApp.
Developer
Al Ali Property Investment
Figures come from the developer's own materials sent to brokers, dated 6 October 2025. The commentary behind them is written up in the Russian
version of this page.
About the building
20-storey residential building in Al Barsha 1. Developer — Al Ali Property Investment. Architect — Buro Kling Architectural Engineering Consultants.
About the project
Marriott Residences is a 20-storey residential building in Al Barsha 1, currently under construction.
The developer is Al Ali Property Investment. The architecture is by Buro Kling Architectural Engineering Consultants.
The database currently holds 2 lots in this project, from 1 085 000 AED.
Marriott Residences is a branded 20-storey Al Ali Property Investment building on Sheikh Zayed Road in Al Barsha 1, under construction; the last inventory we saw was two-bedrooms only.
What it is
Marriott Residences is a residential building in Al Barsha 1: 20 storeys, developer Al Ali Property Investment, architect Buro Kling Architectural Engineering Consultants. Status: under construction.
In broker exports it's labelled “Marriott SHZ”, and the propsearch passport calls it Marriott Residences Sheikh Zayed Road — the site also has a page under that full name. It's not the Marriott in JVC, which has its own page.
No lots in our database right now.
What was left in inventory
The unit-by-unit inventory on 6 October 2025 showed four available units, all two-bedrooms. No studios, one-bedrooms or three-bedrooms remained.
The quote is more than six months old, so we don't publish figures. The same export was also selling Mews Mansions by the same developer in Nad Al Sheba 1.
Al Barsha is an established district by Mall of the Emirates with schools and metro. Our stock has 9 lots there: median AED 1.79 million, AED 1,350/ft². A branded building on Sheikh Zayed Road has little to do with that median.
Propsearch passport: 20 storeys, Al Ali Property Investment, architect Buro Kling, status “under construction”. Unit-by-unit inventory to brokers dated 6 October 2025 (4 units, all two-bedrooms). Our stock as of 21 September 2026: no lots in the project; Al Barsha statistics.
Al Ali Property Investment. The architecture is by Buro Kling Architectural Engineering Consultants.
How many floors does Marriott Residences have?
20.
When is Marriott Residences handed over?
The project is under construction. I check the exact date for a particular unit in the contract before the deal.
Where is Marriott Residences?
Al Barsha. The district around Mall of the Emirates: villas, apartments, hotels and a metro station, all mixed together.
How much does an apartment in Marriott Residences cost?
The database currently holds 2 lots in this project, from 1 085 000 AED. Prices in the base are live and update every day; ask for the current list for the building before deciding.
TARAF and Marriott announced JW Marriott Residences on Yas Island on 16 October 2026 — the first JW Marriott Residences in Abu Dhabi: 199 homes by the beach and golf course, from AED 3.3m, 50/50 plan, handover in Q2 2030.
A developer with projects in Al Barsha and Nad Al Sheba. Mainland Dubai is not uniformly open to foreign ownership, and the map of what is does not follow district boundaries.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.