Skip to content

City Walk Building 9

City Walk · Meraas Holding

Project factsheet

Storeys 7
Developer Meraas Holding
Status Completed
Completed 2016
District City Walk

About the building

7-storey mixed-use complex in City Walk, completed in 2016. Developer — Meraas Holding.

Specifications for City Walk Building 9 per Propsearch and the Dubai Land Department. They describe the whole building, not the individual unit.

About the project

City Walk Building 9 is a 7-storey mixed-use complex in City Walk, completed in 2016.

The developer is Meraas Holding.

The database currently holds 5 lots in this project, from 3 100 000 AED; 2 of them priced below the market, the deepest discount 5%.

One of City Walk's first buildings, completed by Meraas in 2016; six lots in our database, including two three-bedrooms at AED 7.7 million each.

What it is

City Walk Building 9 is a seven-storey mixed-use Meraas Holding building, completed in 2016. The passport doesn't give the number of apartments.

It belongs to the quarter's early phase: homes above a street of shops and cafés, with traffic pushed to the perimeter. The building has long been occupied and has an operating track record.

Six lots, three formats

Three-bedrooms: two at AED 7.7 million, of 2,314 and 2,313 ft², both 5% below market. Two-bedrooms: AED 4.7 million for 1,763 ft² (3% below market and 12% below comparables), plus 4.9 and 5.8 million for 1,750 ft². One-bedroom: AED 3.1 million for 1,200 ft².

Two three-bedrooms of almost identical size and price look like neighbouring apartments; compare their floor and view directly.

City Walk in our database: 71 lots, median AED 4,350,000, AED 3,248/ft².

Propsearch passport: 7 storeys, mixed-use, Meraas Holding, completed in 2016. Our stock as of 21 September 2026: six lots in the building (size, price, discounts); City Walk lot count, median and price per square foot.

Where it is

Frequently asked about City Walk Building 9

Who is the developer of City Walk Building 9?

Meraas Holding.

How many floors does City Walk Building 9 have?

7.

Has City Walk Building 9 been handed over?

Yes. City Walk Building 9 was handed over in 2016 — it is ready housing you can live in or let straight after the deal.

Where is City Walk Building 9?

City Walk. Meraas’s low-rise urban district off Al Wasl Road: shopfronts at street level, apartments above, and pavements people actually use.

How much does an apartment in City Walk Building 9 cost?

The database currently holds 5 lots in this project, from 3 100 000 AED; 2 of them priced below the market, the deepest discount 5%. The list changes daily — I will send a fresh selection for the building on request.

In the news

What has been written about the building, its developer and City Walk

Where this project stands today

I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram