Skip to content

Anantara Mina Al Arab Residences

Mina Al Arab

Project factsheet

Status Under construction
District Mina Al Arab
Layouts studios, 1, 2, 3, 4 and 5 bedrooms
Handover Q2 2028

Layouts and the handover date come from the sales-launch announcement; the date of that announcement is shown next to the prices. It is what the developer claimed at launch, not a registry record — off-plan, phasing and dates get revised. I will send the current ones over WhatsApp.

Developer prices

The developer's last quote in our materials is dated 25 June 2025, which is more than 6 months old, so the sums are not shown here. I will send the current price list and availability over WhatsApp.

Payment plan
60/40
Handover
Q2 2028
Developer
RAK Properties

Figures come from the developer's own materials sent to brokers, dated 25 June 2025. The commentary behind them is written up in the Russian version of this page.

Floor plans

Floor plans from the developer's own materials. The areas and the unit split on them were correct when the drawing was issued — check them against the plan attached to the contract before the deal.

About the building

Located in Mina Al Arab, currently under construction.

Specifications for Anantara Mina Al Arab Residences as published by the developer — the project is under construction, so there is no Land Department record yet. They describe the whole building, not the individual unit.

About the project

Anantara Mina Al Arab Residences is a residential complex of several buildings in Mina Al Arab, handover is due Q2 2028.

Layouts, according to the sales-launch announcement — studios, 1, 2, 3, 4 and 5 bedrooms.

The database currently holds 1 lot in this project, from 4 750 000 AED.

A community in Ras Al Khaimah for those who want water without resort noise: every villa has its own yacht berth. Studios from AED 2.2 million, villas from AED 12.9 million.

A detail rare for the UAE

The project's villas have their own berth and their own pool. A "house with a yacht berth at the door" format is exceedingly rare in the Emirates — a yacht is usually kept in a community's shared marina.

The positioning at launch was direct: this is an address for those who want to live and rent away from the bustle around the gaming resort, rather than next to it.

Prices

Apartments: a studio from 785 sqft — AED 2.2 million; a one-bedroom from 985 sqft — AED 3.1 million; a two-bedroom from 1,771 sqft — AED 5.6 million; a two-bedroom with a staff room from 2,050 sqft — AED 7.2 million.

Villas with a berth and pool: three bedrooms from 4,500 sqft — AED 12.9 million; four bedrooms from 5,500 sqft — AED 16.5 million; five bedrooms from 6,200 sqft — AED 20.8 million.

Payment plan

10% on booking, 50% during construction, 40% on completion. Handover: Q2 2028.

A balanced profile: 60% is paid before handover, with the balance due once the property can already be inspected.

Sizes, prices, format composition, payment plan and handover date — launch materials, 1 May 2025.

Handover payment

A mortgage covers the final instalment

The final payment on this building falls in 2028 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.

  • Up to 80% of the appraised value, no extra down payment
  • 3.99% fixed for three years, up to 25 years in term
  • 6–12 months before the keys — the bank wants six months of income history

Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.

Ask on WhatsApp

Frequently asked about Anantara Mina Al Arab Residences

When is Anantara Mina Al Arab Residences handed over?

The sales-launch announcement says Q2 2028. The date in the contract for a particular unit can differ — I check it before the deal.

What layouts are there in Anantara Mina Al Arab Residences?

Studios, 1-bedroom, 2-bedroom, 3-bedroom, 4-bedroom and 5-bedroom, according to the sales-launch announcement. Which sizes are actually free right now depends on what is on the market; I will send the current list.

How much does an apartment in Anantara Mina Al Arab Residences cost?

The database currently holds 1 lot in this project, from 4 750 000 AED. Prices move every day, so it is worth asking for the current list for this building.

In the news

What has been written about the building, its developer and Mina Al Arab

Where this project stands today

I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram