Skip to content

Sell your apartment in Dubai

Leave your name and phone number — I will get back to you to discuss price and timing.

How I sell apartments →

MAG 330

City Of Arabia · MAG Group

Project factsheet

Storeys 30
Units in the building 661
Developer MAG Group
Status Under development
District City Of Arabia

About the building

30-storey residential building in City Of Arabia. Developer — MAG Group.

What the building has

  • Swimming pool
  • Gym
  • Children's area

About the project

MAG 330 is a 30-storey residential building in City Of Arabia, currently under construction.

The developer is MAG Group.

The building holds 661 apartments in total.

The database currently holds 8 lots in this project, from 690 000 AED; 7 of them priced below the market, the deepest discount 14%.

30 storeys and 661 apartments from MAG in City of Arabia. Our four lots range from AED 700,000 to 1.83 million, with an average discount of 10.7%.

What this building is

MAG 330 is a 30-storey residential skyscraper in City of Arabia, developed by MAG Group. The building record lists 661 apartments; confirmed amenities include a pool, gym and kids' area.

City of Arabia is a district in Dubailand near Mall of the Emirates, along Emirates Road, built up with affordable-segment housing. Demand there is driven by price and parking availability rather than address.

Our four lots are studios and two-bedroom apartments.

A caveat on sizes

The size field is filled with the same value across all four lots — 571 square feet — despite the mix including both studios and two-bedroom apartments, with prices differing by two and a half times.

The same size across such a spread in price and bedroom count points to mechanical data entry. We're therefore not quoting a price per square foot for this address.

Take the size from the contract and the unit floor plan.

What can be said

Prices range from AED 700,000 to 1.83 million. That's the expected level for the affordable segment of Dubailand.

Three of the four lots are listed at a discount, averaging 10.7%. A double-digit figure in the mass segment means supply is outrunning demand.

Six hundred and sixty-one apartments in one building is a large volume for this district; renting it out means competing chiefly with your own neighbours in the same block.

The propsearch building record (storeys, unit count, building type, developer, district, stage, amenities) and our own stock as of 28 August 2026: 4 lots — price range, bedroom mix, status, number of discounted lots and average discount size. The size field is filled mechanically and isn't used.

Registered sales in the building

In 2025 the Dubai Land Department registered 154 sales in MAG 330, at a median price of AED 1 097 000 (AED 1 321 per sq ft). Another 50 have been registered since the start of 2026.

Sales by year — Dubai Land Department register
Year Sales Median price AED/sqft Total value
2025 154 AED 1 097 000 1 321 AED 186.1m
2026, to 18 November 50 AED 1 344 405 1 191 AED 67.9m

Registered sales of all property types; 2026 is a partial year. Medians, not averages; with fewer than 5 sales no price is quoted. Off-plan share of sales over the last 12 months: 57%.

Rents across the City Of Arabia community — not this building alone
Type Annual rent Contracts Gross yield
Studios AED 50 000 17 —
1-bedroom AED 65 000 39 —
2-bedroom AED 93 000 19 5.7%

Median Ejari contract (November 2025 — October 2026) across the whole community rather than this building: rents are not published building by building. Gross yield — before service charges, vacancy and fees.

Price per sq ft by month

Between February 2025 and October 2026 the median price per sq ft moved from AED 1 332 to AED 1 130 (−15.2%).

1 421 1 125 February 2025: 1 332 AED/sqft April 2025: 1 355 AED/sqft May 2025: 1 307 AED/sqft June 2025: 1 143 AED/sqft August 2025: 1 421 AED/sqft September 2025: 1 163 AED/sqft October 2025: 1 125 AED/sqft November 2025: 1 188 AED/sqft December 2025: 1 189 AED/sqft January 2026: 1 154 AED/sqft February 2026: 1 337 AED/sqft August 2026: 1 299 AED/sqft October 2026: 1 130 AED/sqft February 2025 October 2026

Monthly median of registered sales, ready and off-plan together; months with fewer than five sales are left out.

Latest registered sales
Date Unit Status Size, sq ft Price AED/sqft
11/11/2026 Apartment, 1-bedroom ready 811 AED 885 000 1 091
09/11/2026 Apartment, 1-bedroom ready 811 AED 875 000 1 079
09/11/2026 Apartment, 1-bedroom ready 811 AED 910 000 1 122
27/10/2026 Apartment, 1-bedroom ready 839 AED 666 385 794
27/10/2026 Apartment, 1-bedroom ready 798 AED 875 000 1 096
26/10/2026 Apartment, 1-bedroom ready 880 AED 880 000 1 000
23/10/2026 Apartment, 1-bedroom ready 1 077 AED 1 040 000 966
20/10/2026 Apartment, studio ready 602 AED 680 000 1 130
19/10/2026 Apartment, 1-bedroom ready 798 AED 1 060 000 1 328
15/10/2026 Apartment, studio ready 591 AED 833 000 1 410
12/10/2026 Apartment, 1-bedroom ready 796 AED 950 000 1 194
07/10/2026 Apartment, studio ready 591 AED 700 000 1 185
21/09/2026 Apartment, 2-bedroom ready 1 454 AED 1 643 450 1 130
14/09/2026 Apartment, studio ready 572 AED 680 650 1 191
07/09/2026 Apartment, studio ready 590 AED 590 000 999
25/08/2026 Apartment, 2-bedroom ready 1 200 AED 1 428 810 1 191
24/08/2026 Apartment, 2-bedroom ready 1 521 AED 2 000 000 1 315
24/08/2026 Apartment, 2-bedroom ready 1 454 AED 1 644 000 1 131
21/08/2026 Apartment, 1-bedroom ready 811 AED 1 143 360 1 409
21/08/2026 Apartment, 2-bedroom ready 1 454 AED 1 643 445 1 130
21/08/2026 Apartment, 2-bedroom ready 1 454 AED 1 644 000 1 131
20/08/2026 Apartment, 2-bedroom ready 1 312 AED 2 042 000 1 556
20/08/2026 Apartment, studio ready 593 AED 706 400 1 192
19/08/2026 Apartment, 2-bedroom off-plan 1 454 AED 1 865 440 1 283

Buyer, seller and unit number are not part of the Land Department open data.

Source: Dubai Data (calculated from Dubai Land Department open data), data to 18 November 2026.

How many deals this location is doing

7.6% of the month's registrations in Dubai

That is the share of every off-plan deal in the emirate for the month that went to City of Arabia — out of 9 475 registrations. For scale: off-plan accounts for 72.8% of the market as a whole, so the bulk of the city's turnover runs through construction rather than through finished homes.

🔴 This is a figure for the location, not for this building. A cluster holds dozens of towers with different handover dates and prices, and a high share means there is a lot of supply here and a lot of deals — not that this particular tower sells better than its neighbour. On a resale that cuts both ways: liquidity is higher, but so is the number of flats competing with yours.

Monthly ValuStrat market review for July 2026, checked 24 August 2026.

What the complex has

Swimming pool
Gym
Children's area

Where it is

Handover payment

A mortgage covers the final instalment

The final payment on this building falls in 2026 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.

  • Up to 80% of the appraised value, no extra down payment
  • 3.99% fixed for three years, up to 25 years in term
  • 6–12 months before the keys — the bank wants six months of income history

Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.

Ask on WhatsApp

Frequently asked about MAG 330

Who is the developer of MAG 330?

MAG Group.

How many floors does MAG 330 have?

30. The building has 661 apartments.

When is MAG 330 handed over?

The project is under construction. I check the exact date for a particular unit in the contract before the deal.

Where is MAG 330?

Dubailand. Not one district but a vast planned region covering much of inland Dubai — a name that means very little without a sub-community attached.

How much does an apartment in MAG 330 cost?

The database currently holds 8 lots in this project, from 690 000 AED; 7 of them priced below the market, the deepest discount 14%. The list changes daily — I will send a fresh selection for the building on request.

What is on site at MAG 330?

Swimming pool, Gym, Children's area. The list comes from the project description and covers the whole complex.

In the news

What has been written about the building, its developer and City Of Arabia

Where this project stands today

Message me for the free layouts in MAG 330, the real entry price and what owners and tenants say — not the brochure copy.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram

Who is this lot for?

One question, and the chat opens with the request ready.