Seven new malls in the UAE: Dubai Square, Sobha Mall and South Bay Mall
Seven new shopping centres are slated to open across the UAE in 2026. In Dubai the most anticipated are Sobha Mall in Sobha Hartland, Villa Square in Wadi Al Safa 5 and South Bay Mall in Dubai South, with Dubai Square in Creek Harbour to follow.
Seven new shopping centres are planned to open across the UAE in 2026. In Dubai the most anticipated are Sobha Mall in Sobha Hartland, Villa Square in Wadi Al Safa 5 and South Bay Mall in Dubai South. A separate story is Dubai Square in Dubai Creek Harbour: Emaar's concept is a technology-led mall where you can shop without leaving your electric car, inside the building.
Why this matters more than it looks
A mall in Dubai is not only retail. In this climate it performs the role the street plays in other cities: it is where people go to walk, eat, meet and take children at the weekend. For eight months of the year an open street is physically unsuitable for that, and the shopping centre becomes the district's public space.
Hence a direct consequence for housing. A mall within walking distance changes quality of life in a district more than another tower or another pool. This is the case where infrastructure adds not square metres to an apartment but the content of a weekday evening.
Talk to a licensed broker: 📲 +971 50 120 32 64 on WhatsApp, @dubai_oleg on Telegram
What to watch at each address
- Sobha Hartland — already built and populated; the mall arrives to existing demand rather than creating it.
- Dubai South — the opposite case: South Bay Mall is being built where the district is still forming and will be one of its first anchors. For a buyer that is an early stage, with both upside and risk elevated.
- Dubai Creek Harbour — Dubai Square is still several years away, but the very existence of an announced mall at that scale already shapes how the market prices the district.
A sober caveat
An announced mall and an open mall are different things, and the difference is measured in years. Dubai's record includes projects that slipped by half a decade. Price a promised shopping centre into a purchase with a discount for timing; price an opened one in full.
The broader context is worth holding too: seven new centres in a year is a meaningful addition of retail space. Some footfall will inevitably shift from existing malls to new ones — which is good news for districts where shopping currently means driving across the city.
Based on official announcements from developers and mall operators.
In the news
Other write-ups on the site about the same thing.
Tasreef: AED 30bn and a 700% increase in Dubai’s stormwater capacity
After the April 2024 flood Dubai approved the largest single stormwater collection scheme in the region, running to 2033. What is being built, and the three questions worth asking about any specific district before buying.
Flying taxis hit UAE skies in 2026: DXB to the Palm in 12 minutes, Abu Dhabi to Dubai in under half an hour
Dubai and Abu Dhabi air taxis start commercial flights in 2026: the first vertiport at DXB is finished and the capital has priced its routes. Where the vertiports are, flight times, what an Abu Dhabi to Dubai air taxi will cost and what it means for property.
UAE Mangroves: Halfway to 100 Million Trees
The UAE has planted 51% of its target 100 million mangrove trees by 2030. The program protects the coastline from erosion — and it's the one environmental initiative that directly affects owners of waterfront property.
UAE's New Oases: How Dubai and Abu Dhabi Are Turning the Desert Green
Dubai ecotourism and green communities: Al Layan Oasis in Al Marmoom, Expo Valley Nature Reserve at Expo City Dubai, Hudayriyat Island in Abu Dhabi and Kalba in Sharjah. What is being built, when it opens and why nature is becoming part of UAE real estate.
Dubai Auto Market: DP World's 22-million-sq-ft car trading hub, and what it means for warehouses and housing
DP World was mandated in 2024 to expand Dubai's car market eightfold; in November 2025 the project was unveiled at 22 million sq ft — 1 500 showrooms, capacity for 800 000 vehicles a year, an auction house and a hotel. Current turnover of AED 6.8bn is expected to double.
Air taxi in Dubai: airport — Downtown — Marina — Palm
Four passengers and a pilot, electric, between the four locations with the heaviest ground traffic and the most expensive property. What it does to prices, and what to treat with caution.





